POSTLE UPPER MORROW UNIT #9-7

API 3513920453 · Texas County, Oklahoma

ACOIL
API
3513920453
Operator
BREITBURN OPERATING LP
County
Texas

Completions

Oklahoma files 2 completion reports for this well. One carries a production test the operator filed.

Completion 0

STRAIGHT HOLEACOIL
Spudded
1970-10-26
Drilling finished
1970-11-15
Completed
1970-11-29
Recompleted
2010-12-08
First production
1970-11-19
Total depth
6,233 ft
Operator
BREITBURN OPERATING LP

Interval

FormationProducedPerforated (ft)Treatment
MORROW AINJ6,088–6,106Acid

Casing

StringSize (in)Weight (lb/ft)GradeSet (ft)Cement (sacks)
PRODUCTION5 1/214J-556,232150
INTERMEDIATE8 5/824J-551,748250
LINER410.8UF6,183250
SURFACE13 3/848H-40540450

Completion 1

STRAIGHT HOLEACOIL
Spudded
1970-10-26
Drilling finished
1970-11-15
Completed
1970-11-29
Recompleted
2012-04-25
First production
1970-11-19
Total depth
6,233 ft
Operator
BREITBURN OPERATING LP

Interval

FormationProducedPerforated (ft)Treatment
MORROW AOIL6,088–6,106Acid

Production test

TestedOil (bbl/d)Gas (MCF/d)Water (bbl/d)Gravity (°API)Shut-in (psi)Choke
2012-05-2431543139.40OPEN

A production test is one measurement the operator made on one day and filed with Oklahoma. It is not a monthly average and it does not describe how the well produced afterwards. The choke size is shown exactly as filed: Oklahoma records it in inches on some reports and in sixty-fourths of an inch on others, and names the unit on neither. A dash is a measurement Oklahoma did not file, or one it filed outside any physically possible range.

Casing

StringSize (in)Weight (lb/ft)GradeSet (ft)Cement (sacks)
PRODUCTION5 1/214J-556,232150
LINER410.8UF6,183250
INTERMEDIATE8 5/824J-551,748250
SURFACE13 3/848H-40540450

Location

36.919330, -101.615750

36.91933, -101.61575 · Surface location as filed with Oklahoma

Every well in Texas County, Oklahoma

Oklahoma state record, from OK_wells_rbdms-wells.parquet. Corpus built 2026-09-11.