NEWSOM #1-15
API 3513920987 · Texas County, Oklahoma
ACGAS
Completion
Oklahoma files 1 completion report for this well. One carries a production test the operator filed.
Completion 2
STRAIGHT HOLEACGASSpudded
1981-12-10
Drilling finished
1981-12-18
Completed
1981-12-18
Total depth
6,654 ft
Operator
HARTMAN OIL COMPANY INC
Interval
| Formation | Produced | Perforated (ft) |
|---|---|---|
| UPPER MORROW | GAS | 6,084–6,110 |
Production test
| Tested | Oil (bbl/d) | Gas (MCF/d) | Water (bbl/d) | Gravity (°API) | Shut-in (psi) | Choke |
|---|---|---|---|---|---|---|
| 2014-07-28 | 0 | 13 | 0 | — | 15 | — |
A production test is one measurement the operator made on one day and filed with Oklahoma. It is not a monthly average and it does not describe how the well produced afterwards. The choke size is shown exactly as filed: Oklahoma records it in inches on some reports and in sixty-fourths of an inch on others, and names the unit on neither. A dash is a measurement Oklahoma did not file, or one it filed outside any physically possible range.
Casing
| String | Size (in) | Weight (lb/ft) | Grade | Set (ft) | Cement (sacks) |
|---|---|---|---|---|---|
| CONDUCTOR | 20 | — | — | 40 | 7 |
| PRODUCTION | 5 1/2 | — | — | 6,601 | 200 |
| SURFACE | 8 5/8 | 20 | — | 1,349 | 650 |
Location
36.895861, -101.315667
36.89586, -101.31567 · Surface location as filed with Oklahoma⌘ or Ctrl + scroll to zoom
Every well in Texas County, Oklahoma
Oklahoma state record, from OK_wells_rbdms-wells.parquet. Corpus built 2026-09-11.