STEFFEN UNIT #2
API 3513921220 · Texas County, Oklahoma
ACGAS
Completion
Oklahoma files 1 completion report for this well. One carries a production test the operator filed.
Completion 0
STRAIGHT HOLEACGASSpudded
1979-06-06
Drilling finished
1979-06-22
Completed
1979-07-23
First production
1979-07-17
Total depth
7,069 ft
Operator
BCE-MACH LLC
Interval
| Formation | Produced | Top (ft) | Perforated (ft) |
|---|---|---|---|
| L. MORROW | GAS | 6,959 | 6,944–7,069 |
Production test
| Tested | Oil (bbl/d) | Gas (MCF/d) | Water (bbl/d) | Gravity (°API) | Shut-in (psi) | Choke |
|---|---|---|---|---|---|---|
| 1979-07-23 | 0 | 300 | 3 | — | 0 | — |
A production test is one measurement the operator made on one day and filed with Oklahoma. It is not a monthly average and it does not describe how the well produced afterwards. The choke size is shown exactly as filed: Oklahoma records it in inches on some reports and in sixty-fourths of an inch on others, and names the unit on neither. A dash is a measurement Oklahoma did not file, or one it filed outside any physically possible range.
Casing
| String | Size (in) | Weight (lb/ft) | Grade | Set (ft) | Cement (sacks) |
|---|---|---|---|---|---|
| PRODUCTION | 5 1/2 | 14 | K-55 | 7,154 | 150 |
| SURFACE | 8 5/8 | 24 | K-55 | 1,545 | 875 |
Location
36.533060, -101.156500
36.53306, -101.15650 · Surface location as filed with Oklahoma⌘ or Ctrl + scroll to zoom
Every well in Texas County, Oklahoma
Oklahoma state record, from OK_wells_rbdms-wells.parquet. Corpus built 2026-09-11.