HOVEY MORROW UNIT #18-3
API 3513921577 · Texas County, Oklahoma
ACOIL
Completion
Oklahoma files 1 completion report for this well. One carries a production test the operator filed.
Completion 3
STRAIGHT HOLEACOILSpudded
1982-03-08
Drilling finished
1982-03-30
Completed
1982-04-20
Recompleted
2013-06-24
First production
2008-01-16
Total depth
6,280 ft
Operator
BREITBURN OPERATING LP
Interval
| Formation | Produced | Perforated (ft) | Treatment |
|---|---|---|---|
| MORROW | OIL | 6,168–6,188 | Acid |
Production test
| Tested | Oil (bbl/d) | Gas (MCF/d) | Water (bbl/d) | Gravity (°API) | Shut-in (psi) | Choke |
|---|---|---|---|---|---|---|
| 2013-06-29 | 32 | 25 | 164 | 39 | 0 | OPEN |
A production test is one measurement the operator made on one day and filed with Oklahoma. It is not a monthly average and it does not describe how the well produced afterwards. The choke size is shown exactly as filed: Oklahoma records it in inches on some reports and in sixty-fourths of an inch on others, and names the unit on neither. A dash is a measurement Oklahoma did not file, or one it filed outside any physically possible range.
Casing
| String | Size (in) | Weight (lb/ft) | Grade | Set (ft) | Cement (sacks) |
|---|---|---|---|---|---|
| PRODUCTION | 5 1/2 | 15.5 | K-55 | 6,280 | 325 |
| LINER | 4 | 10.46 | J-55 | 610 | 75 |
| SURFACE | 8 5/8 | 24 | K-55 | 1,784 | 750 |
Location
36.901220, -101.647310
36.90122, -101.64731 · Surface location as filed with Oklahoma⌘ or Ctrl + scroll to zoom
Every well in Texas County, Oklahoma
Oklahoma state record, from OK_wells_rbdms-wells.parquet. Corpus built 2026-09-11.