LAIRD #36-2
API 3513922792 · Texas County, Oklahoma
Injection
12 monthly filings with Oklahoma, Jan 2025 to Dec 2025.
| Month | Fluid injected (bbl) | Max pressure (psi) |
|---|---|---|
| Dec 2025 | 0 | 0 |
| Nov 2025 | 0 | 0 |
| Oct 2025 | 0 | 0 |
| Sep 2025 | 0 | 0 |
| Aug 2025 | 0 | 0 |
| Jul 2025 | 0 | 0 |
| Jun 2025 | 0 | 0 |
| May 2025 | 0 | 0 |
| Apr 2025 | 0 | 0 |
| Mar 2025 | 0 | 0 |
| Feb 2025 | 0 | 0 |
| Jan 2025 | 0 | 0 |
A dash is a month the well filed with no figure in that column.
Completion
Oklahoma files 1 completion report for this well.
Completion 1
STRAIGHT HOLEAC2RInInterval
| Formation | Produced | Perforated (ft) |
|---|---|---|
| CHEROKEE | INJ | 5,856–5,874 |
Casing
| String | Size (in) | Weight (lb/ft) | Grade | Set (ft) | Cement (sacks) |
|---|---|---|---|---|---|
| PRODUCTION | 5 1/2 | 15.5 | J-55 | 7,250 | 300 |
| LINER | 4 1/2 | — | — | 5,822 | 450 |
| SURFACE | 8 5/8 | 24 | J-55 | 1,390 | 650 |
Drilling permit
Oklahoma files 1 application to drill this well, naming 9 target formations. A permit records what an operator asked to do, not what it did. A target formation is where the operator aimed, and the hole may have missed it, stopped short of it or never been drilled.
Filed 1997-08-15
WRADRTarget formations
| Formation | Expected top (ft) |
|---|---|
| COUNCIL GROVE | 3,000 |
| TORONTO | 4,350 |
| LANSING | 4,475 |
| KANSAS CITY | 4,850 |
| MARMATON | 5,500 |
| CHEROKEE | 5,825 |
| MORROW | 6,350 |
| CHESTER | 6,750 |
| ST LOUIS | 7,100 |
An expected top is the depth the operator predicted before drilling, on the application it filed with Oklahoma. It is not a measurement of where the formation was found.
Location
36.687250, -101.395640
Every well in Texas County, Oklahoma
Oklahoma state record, from OK_wells_rbdms-wells.parquet. Corpus built 2026-09-11.