CECIL A (STONEBRAKER AH 3) #1
API 3513924340 · Texas County, Oklahoma
Completion
Oklahoma files 1 completion report for this well. One carries a production test the operator filed.
Completion 1
STRAIGHT HOLEACGASInterval
| Formation | Produced | Perforated (ft) |
|---|---|---|
| MORROW | GAS | 6,061–6,069 |
Production test
| Tested | Oil (bbl/d) | Gas (MCF/d) | Water (bbl/d) | Gravity (°API) | Shut-in (psi) | Choke |
|---|---|---|---|---|---|---|
| 2012-08-23 | 0 | 23 | 0 | — | 0 | OPEN |
A production test is one measurement the operator made on one day and filed with Oklahoma. It is not a monthly average and it does not describe how the well produced afterwards. The choke size is shown exactly as filed: Oklahoma records it in inches on some reports and in sixty-fourths of an inch on others, and names the unit on neither. A dash is a measurement Oklahoma did not file, or one it filed outside any physically possible range.
Casing
| String | Size (in) | Weight (lb/ft) | Grade | Set (ft) | Cement (sacks) |
|---|---|---|---|---|---|
| PRODUCTION | 5.5 | 17 | J-55 | 6,417 | 125 |
| SURFACE | 8.625 | 24 | J-55 | 1,705 | 700 |
Drilling permit
Oklahoma files 1 application to drill this well, naming 9 target formations. A permit records what an operator asked to do, not what it did. A target formation is where the operator aimed, and the hole may have missed it, stopped short of it or never been drilled.
Filed 2008-01-07
WRADRStraight holeTarget formations
| Formation | Expected top (ft) |
|---|---|
| COUNCIL GROVE | 2,979 |
| WABAUNSEE | 3,356 |
| SHAWNEE | 3,622 |
| DOUGLAS | 4,318 |
| LANSING | 4,410 |
| KANSAS CITY | 4,641 |
| MARMATON | 4,971 |
| CHEROKEE | 5,334 |
| MORROW | 5,995 |
An expected top is the depth the operator predicted before drilling, on the application it filed with Oklahoma. It is not a measurement of where the formation was found.
Location
36.633528, -101.792722
Every well in Texas County, Oklahoma
Oklahoma state record, from OK_wells_rbdms-wells.parquet. Corpus built 2026-09-11.