NE HARDESTY UNIT #2-1
API 3513935637 · Texas County, Oklahoma
ACOIL
Completion
Oklahoma files 1 completion report for this well. One carries a production test the operator filed.
Completion 3
STRAIGHT HOLEACOILSpudded
1964-06-08
Drilling finished
1964-06-27
Completed
1964-07-17
Recompleted
2012-02-14
First production
2012-05-29
Total depth
6,500 ft
Operator
BREITBURN OPERATING LP
Interval
| Formation | Produced | Perforated (ft) |
|---|---|---|
| UPPER MORROW | OIL | 6,308–6,340 |
Production test
| Tested | Oil (bbl/d) | Gas (MCF/d) | Water (bbl/d) | Gravity (°API) | Shut-in (psi) | Choke |
|---|---|---|---|---|---|---|
| 2012-07-22 | 1 | 0 | 76 | 40 | 0 | — |
A production test is one measurement the operator made on one day and filed with Oklahoma. It is not a monthly average and it does not describe how the well produced afterwards. The choke size is shown exactly as filed: Oklahoma records it in inches on some reports and in sixty-fourths of an inch on others, and names the unit on neither. A dash is a measurement Oklahoma did not file, or one it filed outside any physically possible range.
Casing
| String | Size (in) | Weight (lb/ft) | Grade | Set (ft) | Cement (sacks) |
|---|---|---|---|---|---|
| PRODUCTION | 1/2 | 15.5 | J-55 | 6,495 | 125 |
| SURFACE | 8 5/8 | 24 | J-55 | 2,334 | 200 |
Location
36.756390, -101.091080
36.75639, -101.09108 · Surface location as filed with Oklahoma⌘ or Ctrl + scroll to zoom
Every well in Texas County, Oklahoma
Oklahoma state record, from OK_wells_rbdms-wells.parquet. Corpus built 2026-09-11.