STONEBRAKER AP #1

API 3513935959 · Texas County, Oklahoma

ACGAS
API
3513935959
Operator
EIGER OPERATING COMPANY, LLC
County
Texas

Completion

Oklahoma files 1 completion report for this well. One carries a production test the operator filed.

Completion 3

STRAIGHT HOLEACGAS
Spudded
1964-03-22
Drilling finished
1964-05-25
Completed
1972-06-12
Recompleted
2014-12-09
First production
1972-06-21
Total depth
7,643 ft
Operator
EIGER OPERATING COMPANY, LLC

Intervals

FormationProducedPerforated (ft)
TORONTOGAS4,178–4,188
MORROW UPGAS5,874–5,898

Production tests

TestedOil (bbl/d)Gas (MCF/d)Water (bbl/d)Gravity (°API)Shut-in (psi)Choke
1972-06-1207,1780—0—
—264250040.10—

A production test is one measurement the operator made on one day and filed with Oklahoma. It is not a monthly average and it does not describe how the well produced afterwards. The choke size is shown exactly as filed: Oklahoma records it in inches on some reports and in sixty-fourths of an inch on others, and names the unit on neither. A dash is a measurement Oklahoma did not file, or one it filed outside any physically possible range.

Casing

StringSize (in)Weight (lb/ft)GradeSet (ft)Cement (sacks)
PRODUCTION5 1/214, 15.5J-556,000425
SURFACE8 5/824J-551,659650

Location

36.724360, -101.792170

36.72436, -101.79217 · Surface location as filed with Oklahoma

Every well in Texas County, Oklahoma

Oklahoma state record, from OK_wells_rbdms-wells.parquet. Corpus built 2026-09-11.