NORTHEAST HARDESTY UNIT #13-1
API 3513936042 · Texas County, Oklahoma
ACOIL
Completion
Oklahoma files 1 completion report for this well. One carries a production test the operator filed.
Completion 3
STRAIGHT HOLEACOILSpudded
1964-03-12
Drilling finished
1964-03-29
Completed
1964-04-10
Recompleted
2011-09-15
First production
1964-04-09
Total depth
6,409 ft
Operator
BREITBURN OPERATING LP
Interval
| Formation | Produced | Perforated (ft) |
|---|---|---|
| MORROW | OIL | 6,327–6,353 |
Production test
| Tested | Oil (bbl/d) | Gas (MCF/d) | Water (bbl/d) | Gravity (°API) | Shut-in (psi) | Choke |
|---|---|---|---|---|---|---|
| 2012-12-15 | 1 | 0 | 24 | 38.4 | 0 | OPEN |
A production test is one measurement the operator made on one day and filed with Oklahoma. It is not a monthly average and it does not describe how the well produced afterwards. The choke size is shown exactly as filed: Oklahoma records it in inches on some reports and in sixty-fourths of an inch on others, and names the unit on neither. A dash is a measurement Oklahoma did not file, or one it filed outside any physically possible range.
Casing
| String | Size (in) | Weight (lb/ft) | Grade | Set (ft) | Cement (sacks) |
|---|---|---|---|---|---|
| PRODUCTION | 4 1/2 | 9.5 | J-55 | 6,398 | 100 |
| SURFACE | 8 5/8 | 24 | J-55 | 1,475 | 525 |
Location
36.752810, -101.095530
36.75281, -101.09553 · Surface location as filed with Oklahoma⌘ or Ctrl + scroll to zoom
Every well in Texas County, Oklahoma
Oklahoma state record, from OK_wells_rbdms-wells.parquet. Corpus built 2026-09-11.