WELCH #16
API 3514320489 · Tulsa County, Oklahoma
AC2RIn
Injection
12 monthly filings with Oklahoma, Jan 2025 to Dec 2025.
Oklahoma well-type code
2RIn
Cumulative fluid injected
88,290 bbl
| Month | Fluid injected (bbl) | Max pressure (psi) |
|---|---|---|
| Dec 2025 | 7,020 | 460 |
| Nov 2025 | 7,020 | 460 |
| Oct 2025 | 7,020 | 460 |
| Sep 2025 | 7,470 | 460 |
| Aug 2025 | 7,470 | 460 |
| Jul 2025 | 7,470 | 460 |
| Jun 2025 | 7,470 | 460 |
| May 2025 | 7,470 | 460 |
| Apr 2025 | 7,470 | 460 |
| Mar 2025 | 7,470 | 460 |
| Feb 2025 | 7,470 | 460 |
| Jan 2025 | 7,470 | 460 |
A dash is a month the well filed with no figure in that column.
Completions
Oklahoma files 2 completion reports for this well.
Completion 1
STRAIGHT HOLEAC2RInSpudded
1977-06-13
Drilling finished
1977-07-26
Completed
1977-08-10
Recompleted
2011-07-19
First production
1977-08-10
Total depth
1,084 ft
Operator
COLPITT C H DRILLING CO LLC
Interval
| Formation | Produced | Perforated (ft) |
|---|---|---|
| RED FORK | INJ | 1,046–1,064 |
Casing
| String | Size (in) | Weight (lb/ft) | Grade | Set (ft) | Cement (sacks) |
|---|---|---|---|---|---|
| CONDUCTOR | 10 | — | — | 30 | 0 |
| PRODUCTION | 5 1/2 | — | — | 1,083 | 0 |
Completion 2
STRAIGHT HOLEAC2RInSpudded
1977-06-13
Drilling finished
1977-07-26
Completed
1977-08-10
Recompleted
2021-10-28
First production
1977-08-10
Total depth
1,084 ft
Operator
COLPITT C H DRILLING CO LLC
Interval
| Formation | Produced | Perforated (ft) |
|---|---|---|
| RED FORK | INJ | 1,046–1,064 |
Casing
| String | Size (in) | Weight (lb/ft) | Grade | Set (ft) | Cement (sacks) |
|---|---|---|---|---|---|
| LINER | 4 1/2 | — | — | 1,027 | 25 |
| CONDUCTOR | 10 | — | — | 30 | 0 |
| PRODUCTION | 5 1/2 | — | — | 1,083 | 170 |
Location
36.336200, -95.914430
36.33620, -95.91443 · Surface location as filed with Oklahoma⌘ or Ctrl + scroll to zoom
Every well in Tulsa County, Oklahoma
Oklahoma state record, from OK_wells_rbdms-wells.parquet. Corpus built 2026-09-11.