TAYLOR JAMES #7
API 3514708332 · Washington County, Oklahoma
ACOIL
Completion
Oklahoma files 1 completion report for this well. One carries a production test the operator filed.
Completion 0
STRAIGHT HOLEACOILSpudded
1913-01-01
Drilling finished
1913-08-02
Completed
1956-08-08
First production
1956-08-08
Total depth
1,183 ft
Operator
BLR ENERGY LLC
Interval
| Formation | Produced | Perforated (ft) | Treatment |
|---|---|---|---|
| BARTLESVILLE | OIL | 1,153–1,180 | Frac |
Production test
| Tested | Oil (bbl/d) | Gas (MCF/d) | Water (bbl/d) | Gravity (°API) | Shut-in (psi) | Choke |
|---|---|---|---|---|---|---|
| 1956-08-08 | 30 | 0 | 10 | 37 | 0 | — |
A production test is one measurement the operator made on one day and filed with Oklahoma. It is not a monthly average and it does not describe how the well produced afterwards. The choke size is shown exactly as filed: Oklahoma records it in inches on some reports and in sixty-fourths of an inch on others, and names the unit on neither. A dash is a measurement Oklahoma did not file, or one it filed outside any physically possible range.
Casing
| String | Size (in) | Weight (lb/ft) | Grade | Set (ft) | Cement (sacks) |
|---|---|---|---|---|---|
| PRODUCTION | 4 1/2 | 10.5 | — | 1,138 | 25 |
| SURFACE | 8" | — | — | 15 | 0 |
Location
36.705430, -95.865746
36.70543, -95.86575 · Surface location as filed with Oklahoma⌘ or Ctrl + scroll to zoom
Every well in Washington County, Oklahoma
Oklahoma state record, from OK_wells_rbdms-wells.parquet. Corpus built 2026-09-11.