HOPPER #5
API 3514727451 · Washington County, Oklahoma
Drilling permits
Oklahoma files 2 applications to drill this well, naming 20 target formations. A permit records what an operator asked to do, not what it did. A target formation is where the operator aimed, and the hole may have missed it, stopped short of it or never been drilled.
Filed 2005-07-27
WRADRTarget formations
| Formation | Expected top (ft) |
|---|---|
| BIG LIME | 750 |
| PERU | 835 |
| OSWEGO | 1,010 |
| SUMMIT | 1,040 |
| MULKY | 1,060 |
| SKINNER | 1,170 |
| RIVERTON | 1,390 |
| BARTLESVILLE | 1,410 |
| ROWE COAL | 1,480 |
| MISSISSIPPI CHAT | 1,610 |
An expected top is the depth the operator predicted before drilling, on the application it filed with Oklahoma. It is not a measurement of where the formation was found.
Filed 2007-02-23
WRAAMTarget formations
| Formation | Expected top (ft) |
|---|---|
| BIG LIME | 750 |
| PERU | 835 |
| OSWEGO | 1,010 |
| SUMMIT | 1,040 |
| MULKY | 1,060 |
| SKINNER | 1,170 |
| RIVERTON | 1,390 |
| BARTLESVILLE | 1,410 |
| ROWE COAL | 1,480 |
| MISSISSIPPI CHAT | 1,610 |
An expected top is the depth the operator predicted before drilling, on the application it filed with Oklahoma. It is not a measurement of where the formation was found.
Location
36.540524, -95.979014
Every well in Washington County, Oklahoma
Oklahoma state record, from OK_wells_rbdms-wells.parquet. Corpus built 2026-09-11.