KRISTIN #1-5
API 3514727869 · Washington County, Oklahoma
Completion
Oklahoma files 1 completion report for this well. One carries a production test the operator filed.
Completion 1
STRAIGHT HOLEACOILIntervals
| Formation | Produced | Perforated (ft) |
|---|---|---|
| BARTLESVILLE-IRON POST-MULKY-SUMMIT | OIL | 895–1,274 |
| SUMMIT | OIL | 895–900 |
| MULKY | OIL | 926–931 |
| IRON POST | OIL | 946–950 |
| BARTLESVILLE | OIL | 1,243–1,274 |
Production test
| Tested | Oil (bbl/d) | Gas (MCF/d) | Water (bbl/d) | Gravity (°API) | Shut-in (psi) | Choke |
|---|---|---|---|---|---|---|
| 2014-12-03 | 2 | 16 | 23 | 32.7 | 0 | 64/64 |
A production test is one measurement the operator made on one day and filed with Oklahoma. It is not a monthly average and it does not describe how the well produced afterwards. The choke size is shown exactly as filed: Oklahoma records it in inches on some reports and in sixty-fourths of an inch on others, and names the unit on neither. A dash is a measurement Oklahoma did not file, or one it filed outside any physically possible range.
Casing
| String | Size (in) | Weight (lb/ft) | Grade | Set (ft) | Cement (sacks) |
|---|---|---|---|---|---|
| PRODUCTION | 4.5 | 11.6 | J-55 | 1,553 | 130 |
| SURFACE | 7 | 17 | J-55 | 41 | 5 |
Drilling permits
Oklahoma files 3 applications to drill this well, naming 17 target formations. A permit records what an operator asked to do, not what it did. A target formation is where the operator aimed, and the hole may have missed it, stopped short of it or never been drilled.
Filed 2008-05-08
WRADRStraight holeTarget formations
| Formation | Expected top (ft) |
|---|---|
| SUMMIT | 905 |
| MULKY | 935 |
| IRON POST | 950 |
| BEVIER | 970 |
| PRUE | 975 |
| CROWEBERG | 1,010 |
| TEBO | 1,150 |
| BARTLESVILLE | 1,250 |
| ROWE COAL | 1,410 |
| RIVERTON | 1,465 |
An expected top is the depth the operator predicted before drilling, on the application it filed with Oklahoma. It is not a measurement of where the formation was found.
Filed 2009-04-28
WRARCStraight holeTarget formations
| Formation | Expected top (ft) |
|---|---|
| SUMMIT | 895 |
| MULKY | 926 |
| IRON POST | 946 |
An expected top is the depth the operator predicted before drilling, on the application it filed with Oklahoma. It is not a measurement of where the formation was found.
Filed 2014-10-24
WRARCStraight holeTarget formations
| Formation | Expected top (ft) |
|---|---|
| SUMMIT | 900 |
| MULKY | 931 |
| IRON POST | 950 |
| BARTLESVILLE | 1,274 |
An expected top is the depth the operator predicted before drilling, on the application it filed with Oklahoma. It is not a measurement of where the formation was found.
Location
36.761513, -95.833327
Every well in Washington County, Oklahoma
Oklahoma state record, from OK_wells_rbdms-wells.parquet. Corpus built 2026-09-11.