PALLETT #2
API 3514728057 · Washington County, Oklahoma
Completion
Oklahoma files 1 completion report for this well. One carries a production test the operator filed.
Completion 0
STRAIGHT HOLEACOILIntervals
| Formation | Produced | Perforated (ft) |
|---|---|---|
| DEWEY | OIL | 376–396 |
| BARTLESVILLE | OIL | 1,174–1,184 |
Production test
| Tested | Oil (bbl/d) | Gas (MCF/d) | Water (bbl/d) | Gravity (°API) | Shut-in (psi) | Choke |
|---|---|---|---|---|---|---|
| 2022-07-18 | 0 | 0 | 0 | — | 0 | — |
A production test is one measurement the operator made on one day and filed with Oklahoma. It is not a monthly average and it does not describe how the well produced afterwards. The choke size is shown exactly as filed: Oklahoma records it in inches on some reports and in sixty-fourths of an inch on others, and names the unit on neither. A dash is a measurement Oklahoma did not file, or one it filed outside any physically possible range.
Casing
| String | Size (in) | Weight (lb/ft) | Grade | Set (ft) | Cement (sacks) |
|---|---|---|---|---|---|
| PRODUCTION | 4.5 | — | — | 1,402 | 0 |
| SURFACE | 8.625 | — | — | 50 | 0 |
Drilling permit
Oklahoma files 1 application to drill this well, naming 6 target formations. A permit records what an operator asked to do, not what it did. A target formation is where the operator aimed, and the hole may have missed it, stopped short of it or never been drilled.
Filed 2012-01-13
WRADRStraight holeTarget formations
| Formation | Expected top (ft) |
|---|---|
| WAYSIDE | 400 |
| BIG LIME | 600 |
| OSWEGO | 800 |
| BARTLESVILLE | 1,150 |
| MISSISSIPPI CHAT | 1,380 |
| MISSISSIPPI LM | 1,430 |
An expected top is the depth the operator predicted before drilling, on the application it filed with Oklahoma. It is not a measurement of where the formation was found.
Location
36.808533, -95.882765
Every well in Washington County, Oklahoma
Oklahoma state record, from OK_wells_rbdms-wells.parquet. Corpus built 2026-09-11.