NELLIE CREEK #13-8
API 3514728134 · Washington County, Oklahoma
Injection
12 monthly filings with Oklahoma, Jan 2025 to Dec 2025.
| Month | Fluid injected (bbl) | Max pressure (psi) |
|---|---|---|
| Dec 2025 | 6,568 | 80 |
| Nov 2025 | 5,488 | 80 |
| Oct 2025 | 7,020 | 80 |
| Sep 2025 | 6,289 | 80 |
| Aug 2025 | 6,149 | 80 |
| Jul 2025 | 6,044 | 80 |
| Jun 2025 | 5,621 | 80 |
| May 2025 | 7,491 | 80 |
| Apr 2025 | 7,562 | 80 |
| Mar 2025 | 7,228 | 80 |
| Feb 2025 | 7,494 | 80 |
| Jan 2025 | 6,590 | 80 |
A dash is a month the well filed with no figure in that column.
Completion
Oklahoma files 1 completion report for this well.
Completion 0
STRAIGHT HOLEAC2DNCInterval
| Formation | Produced | Perforated (ft) | Treatment |
|---|---|---|---|
| MISSISSIPPI CHAT | DISP | 1,760–1,775 | Acid |
Casing
| String | Size (in) | Weight (lb/ft) | Grade | Set (ft) | Cement (sacks) |
|---|---|---|---|---|---|
| PRODUCTION | 5.5 | 17 | J-55 | 2,055 | 165 |
| SURFACE | 8 5/8 | 24 | J-55 | 170 | 100 |
Drilling permit
Oklahoma files 1 application to drill this well, naming 6 target formations. A permit records what an operator asked to do, not what it did. A target formation is where the operator aimed, and the hole may have missed it, stopped short of it or never been drilled.
Filed 2013-12-11
WRADRStraight holeTarget formations
| Formation | Expected top (ft) |
|---|---|
| BURGESS | 1,730 |
| MISSISSIPPI CHAT | 1,750 |
| MISSISSIPPI LM | 1,770 |
| KINDERHOOK | 1,980 |
| WOODFORD | 2,010 |
| ARBUCKLE | 2,080 |
An expected top is the depth the operator predicted before drilling, on the application it filed with Oklahoma. It is not a measurement of where the formation was found.
Location
36.486134, -95.954143
Every well in Washington County, Oklahoma
Oklahoma state record, from OK_wells_rbdms-wells.parquet. Corpus built 2026-09-11.