SENA MCALLISTER #1-A
API 3514920128 · Washita County, Oklahoma
ACOIL
Completion
Oklahoma files 1 completion report for this well. One carries a production test the operator filed.
Completion 1
STRAIGHT HOLEACOILSpudded
1980-09-02
Drilling finished
1980-11-01
Completed
1980-12-23
First production
1980-12-23
Total depth
13,760 ft
Operator
TEOCALLI EXPLORATION LLC
Interval
| Formation | Produced | Perforated (ft) |
|---|---|---|
| GRANITE WASH | OIL | 11,750–12,978 |
Production test
| Tested | Oil (bbl/d) | Gas (MCF/d) | Water (bbl/d) | Gravity (°API) | Shut-in (psi) | Choke |
|---|---|---|---|---|---|---|
| 2012-08-11 | 25 | 11 | 70 | — | 0 | — |
A production test is one measurement the operator made on one day and filed with Oklahoma. It is not a monthly average and it does not describe how the well produced afterwards. The choke size is shown exactly as filed: Oklahoma records it in inches on some reports and in sixty-fourths of an inch on others, and names the unit on neither. A dash is a measurement Oklahoma did not file, or one it filed outside any physically possible range.
Casing
| String | Size (in) | Weight (lb/ft) | Grade | Set (ft) | Cement (sacks) |
|---|---|---|---|---|---|
| PRODUCTION | 5 1/2 | 17 | N-80 / S-95 | 13,760 | 2,300 |
| SURFACE | 9 5/8 | 36 | K-55 / N-80 | 4,819 | 2,300 |
Location
35.330974, -99.184200
35.33097, -99.18420 · Surface location as filed with Oklahoma⌘ or Ctrl + scroll to zoom
Every well in Washita County, Oklahoma
Oklahoma state record, from OK_wells_rbdms-wells.parquet. Corpus built 2026-09-11.