ARTHUR #24-1
API 3514920202 · Washita County, Oklahoma
Completion
Oklahoma files 1 completion report for this well. One carries a production test the operator filed.
Completion 1
STRAIGHT HOLEACGASInterval
| Formation | Produced | Perforated (ft) |
|---|---|---|
| SPRINGER | GAS | 18,130–18,156 |
Production test
| Tested | Oil (bbl/d) | Gas (MCF/d) | Water (bbl/d) | Gravity (°API) | Shut-in (psi) | Choke |
|---|---|---|---|---|---|---|
| 2017-01-30 | 0 | 451 | 0 | — | 9,250 | 27/64 |
A production test is one measurement the operator made on one day and filed with Oklahoma. It is not a monthly average and it does not describe how the well produced afterwards. The choke size is shown exactly as filed: Oklahoma records it in inches on some reports and in sixty-fourths of an inch on others, and names the unit on neither. A dash is a measurement Oklahoma did not file, or one it filed outside any physically possible range.
Casing
| String | Size (in) | Weight (lb/ft) | Grade | Set (ft) | Cement (sacks) |
|---|---|---|---|---|---|
| INTERMEDIATE | 9.625 | 62.8 & 53.5 | S95 | 15,730 | 1,831 |
| LINER | 7.75 | — | — | 4,817 | 1,146 |
| PRODUCTION | 2.875 | 8.699999999999999 | P110 | 18,204 | 130 |
| LINER | 5 | — | — | 3,727 | 725 |
| INTERMEDIATE | 13 3/8 | 72 & 68 | N80 & J55 | 3,919 | 2,400 |
| SURFACE | 20 | 94 | H-40 | 524 | 800 |
Drilling permit
Oklahoma files 1 application to drill this well, naming 1 target formation. A permit records what an operator asked to do, not what it did. A target formation is where the operator aimed, and the hole may have missed it, stopped short of it or never been drilled.
Application
REJRCStraight holeTarget formation
| Formation | Expected top (ft) |
|---|---|
| MORROW-SPRINGER | 18,130 |
An expected top is the depth the operator predicted before drilling, on the application it filed with Oklahoma. It is not a measurement of where the formation was found.
Location
35.157150, -98.631250
Every well in Washita County, Oklahoma
Oklahoma state record, from OK_wells_rbdms-wells.parquet. Corpus built 2026-09-11.