MORRIS #1-9
API 3514921533 · Washita County, Oklahoma
Completion
Oklahoma files 1 completion report for this well. One carries a production test the operator filed.
Completion 0
STRAIGHT HOLEACGASInterval
| Formation | Produced | Perforated (ft) | Treatment |
|---|---|---|---|
| SPRINGER | GAS | 21,472–21,806 | Frac |
Production test
| Tested | Oil (bbl/d) | Gas (MCF/d) | Water (bbl/d) | Gravity (°API) | Shut-in (psi) | Choke |
|---|---|---|---|---|---|---|
| 2011-04-04 | 0 | 1,770 | 72 | — | 7,133 | 9/64 |
A production test is one measurement the operator made on one day and filed with Oklahoma. It is not a monthly average and it does not describe how the well produced afterwards. The choke size is shown exactly as filed: Oklahoma records it in inches on some reports and in sixty-fourths of an inch on others, and names the unit on neither. A dash is a measurement Oklahoma did not file, or one it filed outside any physically possible range.
Casing
| String | Size (in) | Weight (lb/ft) | Grade | Set (ft) | Cement (sacks) |
|---|---|---|---|---|---|
| INTERMEDIATE | 13 3/8 | 68 | L-80 | 4,515 | 1,500 |
| PRODUCTION | 9 5/8 | 53.5 | Q-125 | 16,350 | 1,345 |
| LINER | 3 1/2 | 12.7 | 13CR-110 | 6,233 | 1,670 |
| LINER | 7 | 32 | Q-125 | 15,841 | 500 |
| SURFACE | 20 | 94 | J-55 | 565 | 1,790 |
Drilling permit
Oklahoma files 1 application to drill this well, naming 3 target formations. A permit records what an operator asked to do, not what it did. A target formation is where the operator aimed, and the hole may have missed it, stopped short of it or never been drilled.
Filed 2010-07-27
WRADRStraight holeTarget formations
| Formation | Expected top (ft) |
|---|---|
| ATOKA | 15,642 |
| MORROW | 17,240 |
| SPRINGER | 21,195 |
An expected top is the depth the operator predicted before drilling, on the application it filed with Oklahoma. It is not a measurement of where the formation was found.
Location
35.270490, -98.901170
Every well in Washita County, Oklahoma
Oklahoma state record, from OK_wells_rbdms-wells.parquet. Corpus built 2026-09-11.