ARNDT #1-8
API 3515122564 · Woods County, Oklahoma
Completion
Oklahoma files 1 completion report for this well. One carries a production test the operator filed.
Completion 0
STRAIGHT HOLEPAGASIntervals
| Formation | Produced | Perforated (ft) | Treatment |
|---|---|---|---|
| OSWEGO | DRY | 5,190–5,307 | Frac |
| MISSISSIPPI | DRY | 5,405–5,455 | Frac |
Production test
| Tested | Oil (bbl/d) | Gas (MCF/d) | Water (bbl/d) | Gravity (°API) | Shut-in (psi) | Choke |
|---|---|---|---|---|---|---|
| 2011-03-20 | 0 | 0 | 0 | — | 0 | — |
A production test is one measurement the operator made on one day and filed with Oklahoma. It is not a monthly average and it does not describe how the well produced afterwards. The choke size is shown exactly as filed: Oklahoma records it in inches on some reports and in sixty-fourths of an inch on others, and names the unit on neither. A dash is a measurement Oklahoma did not file, or one it filed outside any physically possible range.
Casing
| String | Size (in) | Weight (lb/ft) | Grade | Set (ft) | Cement (sacks) |
|---|---|---|---|---|---|
| PRODUCTION | 4 1/2 | 11.6 | J-55 | 5,550 | 215 |
| SURFACE | 8 5/8 | 24 | J-55 | 1,036 | 550 |
Drilling permit
Oklahoma files 1 application to drill this well, naming 9 target formations. A permit records what an operator asked to do, not what it did. A target formation is where the operator aimed, and the hole may have missed it, stopped short of it or never been drilled.
Filed 2004-09-30
WRADRTarget formations
| Formation | Expected top (ft) |
|---|---|
| BROWN DOLOMITE | 4,120 |
| OREAD | 4,305 |
| HEEBNER | 4,400 |
| DOUGLAS | 4,645 |
| LANSING-KANSAS CITY | 4,945 |
| OSWEGO | 5,245 |
| CHEROKEE | 5,415 |
| CHESTER | 5,430 |
| MISSISSIPPI | 5,505 |
An expected top is the depth the operator predicted before drilling, on the application it filed with Oklahoma. It is not a measurement of where the formation was found.
Location
36.916867, -98.939240
Every well in Woods County, Oklahoma
Oklahoma state record, from OK_wells_rbdms-wells.parquet. Corpus built 2026-09-11.