NORENE #1-10
API 3515123188 · Woods County, Oklahoma
ACOIL
Completion
Oklahoma files 1 completion report for this well.
Completion 2
STRAIGHT HOLEACOILSpudded
2008-06-20
Drilling finished
2008-06-28
Completed
2008-11-12
Recompleted
2017-04-17
First production
2008-10-23
Total depth
6,800 ft
Operator
DIVERSIFIED PRODUCTION LLC
Intervals
| Formation | Produced | Perforated (ft) |
|---|---|---|
| CHESTER | TA | 6,360–6,510 |
| MISSISSIPPI LIME | TA | 6,660–6,670 |
Casing
| String | Size (in) | Weight (lb/ft) | Grade | Set (ft) | Cement (sacks) |
|---|---|---|---|---|---|
| PRODUCTION | 5 1/2 | 17 | J-55 | 6,800 | 220 |
| SURFACE | 8 5/8 | 24 | J-55 | 540 | 200 |
Drilling permit
Oklahoma files 1 application to drill this well, naming 5 target formations. A permit records what an operator asked to do, not what it did. A target formation is where the operator aimed, and the hole may have missed it, stopped short of it or never been drilled.
Filed 2008-06-13
WRADRStraight holePermit API
35151231880000
Operator
CHESAPEAKE OPERATING LLC
Well type
OIL
Approved
2008-06-13
Expires
2008-12-13
Proposed depth
7,219 ft
Surface casing
550 ft
Ground elevation
1,640 ft
Target formations
| Formation | Expected top (ft) |
|---|---|
| TONKAWA | 5,300 |
| DEWEY | 5,840 |
| BIG LIME-OSWEGO | 6,045 |
| CHESTER | 6,385 |
| MISSISSIPPI LM | 6,575 |
An expected top is the depth the operator predicted before drilling, on the application it filed with Oklahoma. It is not a measurement of where the formation was found.
Location
36.572039, -98.798131
36.57204, -98.79813 · Surface location as filed with Oklahoma⌘ or Ctrl + scroll to zoom
Every well in Woods County, Oklahoma
Oklahoma state record, from OK_wells_rbdms-wells.parquet. Corpus built 2026-09-11.