JESSICA SWD #1-12
API 3515123566 · Woods County, Oklahoma
Injection
12 monthly filings with Oklahoma, Jan 2025 to Dec 2025.
| Month | Fluid injected (bbl) | Max pressure (psi) |
|---|---|---|
| Dec 2025 | 29,842 | -113 |
| Nov 2025 | 29,139 | -113 |
| Oct 2025 | 25,520 | -113 |
| Sep 2025 | 28,592 | -113 |
| Aug 2025 | 28,668 | -113 |
| Jul 2025 | 26,376 | -113 |
| Jun 2025 | 26,558 | -113 |
| May 2025 | 28,413 | -113 |
| Apr 2025 | 28,789 | -113 |
| Mar 2025 | 27,509 | -113 |
| Feb 2025 | 26,056 | -113 |
| Jan 2025 | 30,934 | -113 |
A dash is a month the well filed with no figure in that column.
Completion
Oklahoma files 1 completion report for this well.
Completion 1
STRAIGHT HOLEAC2DNCCasing
| String | Size (in) | Weight (lb/ft) | Grade | Set (ft) | Cement (sacks) |
|---|---|---|---|---|---|
| INTERMEDIATE | 7 | 26# | J-55 | 6,485 | 340 |
| CONDUCTOR | 20 | 94# | K-55 | 80 | 12 |
| SURFACE | 9 5/8 | 36# | J-55 | 1,221 | 630 |
Drilling permits
Oklahoma files 2 applications to drill this well, naming 2 target formations. A permit records what an operator asked to do, not what it did. A target formation is where the operator aimed, and the hole may have missed it, stopped short of it or never been drilled.
Filed 2011-11-23
WRADRStraight holeTarget formation
| Formation | Expected top (ft) |
|---|---|
| ARBUCKLE | 6,327 |
An expected top is the depth the operator predicted before drilling, on the application it filed with Oklahoma. It is not a measurement of where the formation was found.
Filed 2011-11-23
WRAAMStraight holeTarget formation
| Formation | Expected top (ft) |
|---|---|
| ARBUCKLE | 6,327 |
An expected top is the depth the operator predicted before drilling, on the application it filed with Oklahoma. It is not a measurement of where the formation was found.
Location
36.828439, -98.660389
Every well in Woods County, Oklahoma
Oklahoma state record, from OK_wells_rbdms-wells.parquet. Corpus built 2026-09-11.