SARAH ANNE SWD 2916 #1-26
API 3515123701 · Woods County, Oklahoma
Injection
12 monthly filings with Oklahoma, Jan 2025 to Dec 2025.
| Month | Fluid injected (bbl) | Max pressure (psi) |
|---|---|---|
| Dec 2025 | 4,739 | 5 |
| Nov 2025 | 3,964 | 5 |
| Oct 2025 | 4,117 | 5 |
| Sep 2025 | 5,257 | 5 |
| Aug 2025 | 4,060 | 5 |
| Jul 2025 | 6,004 | 5 |
| Jun 2025 | 4,161 | 5 |
| May 2025 | 4,318 | 5 |
| Apr 2025 | 0 | 0 |
| Mar 2025 | 2,207 | 5 |
| Feb 2025 | 4,959 | 5 |
| Jan 2025 | 5,530 | 5 |
A dash is a month the well filed with no figure in that column.
Completions
Oklahoma files 2 completion reports for this well.
Completion 1
STRAIGHT HOLEAC2DNCCasing
| String | Size (in) | Weight (lb/ft) | Grade | Set (ft) | Cement (sacks) |
|---|---|---|---|---|---|
| PRODUCTION | 7 | 26# | J-55 | 6,307 | 320 |
| CONDUCTOR | 20 | 94# | J-55 | 90 | 15 |
| INTERMEDIATE | 9 5/8 | 36# | J-55 | 1,445 | 650 |
| SURFACE | 13 3/8 | 68# | J-55 | 368 | 580 |
Completion 2
SERVICE WELLAC2DNCCasing
| String | Size (in) | Weight (lb/ft) | Grade | Set (ft) | Cement (sacks) |
|---|---|---|---|---|---|
| PRODUCTION | 7 | 26 | J-55 | 6,307 | 320 |
| CONDUCTOR | 20 | 94 | J-55 | 90 | 15 |
| INTERMEDIATE | 9 5/8 | 36 | J-55 | 1,445 | 650 |
| SURFACE | 13 3/8 | 68 | J-55 | 368 | 580 |
Drilling permit
Oklahoma files 1 application to drill this well, naming 1 target formation. A permit records what an operator asked to do, not what it did. A target formation is where the operator aimed, and the hole may have missed it, stopped short of it or never been drilled.
Filed 2012-05-30
WRADRStraight holeTarget formation
| Formation | Expected top (ft) |
|---|---|
| ARBUCKLE | 6,164 |
An expected top is the depth the operator predicted before drilling, on the application it filed with Oklahoma. It is not a measurement of where the formation was found.
Location
36.958598, -98.903594
Every well in Woods County, Oklahoma
Oklahoma state record, from OK_wells_rbdms-wells.parquet. Corpus built 2026-09-11.