SHIRLEY NELSON 36-28-18 #1H
API 3515123854 · Woods County, Oklahoma
Completion
Oklahoma files 1 completion report for this well. One carries a production test the operator filed.
Completion 0
HORIZONTAL HOLEACOILInterval
| Formation | Produced | Perforated (ft) | Treatment |
|---|---|---|---|
| MISSISSIPPIAN | OIL | 5,650–10,357 | Acid, Frac |
Production test
| Tested | Oil (bbl/d) | Gas (MCF/d) | Water (bbl/d) | Gravity (°API) | Shut-in (psi) | Choke |
|---|---|---|---|---|---|---|
| 2013-06-26 | 246 | 1,204 | 2,312 | 35.72 | 0 | — |
A production test is one measurement the operator made on one day and filed with Oklahoma. It is not a monthly average and it does not describe how the well produced afterwards. The choke size is shown exactly as filed: Oklahoma records it in inches on some reports and in sixty-fourths of an inch on others, and names the unit on neither. A dash is a measurement Oklahoma did not file, or one it filed outside any physically possible range.
Casing
| String | Size (in) | Weight (lb/ft) | Grade | Set (ft) | Cement (sacks) |
|---|---|---|---|---|---|
| PRODUCTION | 7 | 26 | P-110EC | 5,770 | 210 |
| LINER | 4 1/2 | 13.5 | P-110EC | 5,343 | 650 |
| INTERMEDIATE | 9 5/8 | 36 | J-55 | 1,505 | 412 |
| SURFACE | 13 3/8 | 54.5 | J-55 | 588 | 422 |
Drilling permit
Oklahoma files 1 application to drill this well, naming 4 target formations. A permit records what an operator asked to do, not what it did. A target formation is where the operator aimed, and the hole may have missed it, stopped short of it or never been drilled.
Filed 2013-03-11
WRADRHorizontal holeTarget formations
| Formation | Expected top (ft) |
|---|---|
| DOUGLAS | 4,674 |
| BIG LIME | 5,307 |
| OSWEGO | 5,322 |
| MISSISSIPPIAN | 5,528 |
An expected top is the depth the operator predicted before drilling, on the application it filed with Oklahoma. It is not a measurement of where the formation was found.
Location
36.856255, -99.094693
Every well in Woods County, Oklahoma
Oklahoma state record, from OK_wells_rbdms-wells.parquet. Corpus built 2026-09-11.