RICHMOND #22D
API 3515322378 · Woodward County, Oklahoma
Completion
Oklahoma files 1 completion report for this well. One carries a production test the operator filed.
Completion 1
STRAIGHT HOLEACGASIntervals
| Formation | Produced | Perforated (ft) | Treatment |
|---|---|---|---|
| OSWEGO | GAS | 5,745–6,072 | Acid |
| MISSISSIPPI LIME | GAS | 6,230–6,544 | Acid |
| MISSISSIPPI LIME | DRY | 6,648–6,688 | Acid |
Production test
| Tested | Oil (bbl/d) | Gas (MCF/d) | Water (bbl/d) | Gravity (°API) | Shut-in (psi) | Choke |
|---|---|---|---|---|---|---|
| 2014-09-23 | 0 | 45 | 0 | — | 0 | — |
A production test is one measurement the operator made on one day and filed with Oklahoma. It is not a monthly average and it does not describe how the well produced afterwards. The choke size is shown exactly as filed: Oklahoma records it in inches on some reports and in sixty-fourths of an inch on others, and names the unit on neither. A dash is a measurement Oklahoma did not file, or one it filed outside any physically possible range.
Casing
| String | Size (in) | Weight (lb/ft) | Grade | Set (ft) | Cement (sacks) |
|---|---|---|---|---|---|
| PRODUCTION | 4 1/2 | 11.6 | N-80 | 6,735 | 425 |
| CONDUCTOR | 20 | — | — | 50 | 7 |
| SURFACE | 8 5/8 | 24 | J-55 | 1,044 | 450 |
Drilling permit
Oklahoma files 1 application to drill this well, naming 6 target formations. A permit records what an operator asked to do, not what it did. A target formation is where the operator aimed, and the hole may have missed it, stopped short of it or never been drilled.
Filed 2001-07-18
WRADRTarget formations
| Formation | Expected top (ft) |
|---|---|
| TONKAWA | 5,200 |
| KANSAS CITY | 5,700 |
| OSWEGO | 5,880 |
| RED FORK | 6,150 |
| CHESTER LM | 6,250 |
| MISSISSIPPI LM | 6,300 |
An expected top is the depth the operator predicted before drilling, on the application it filed with Oklahoma. It is not a measurement of where the formation was found.
Every well in Woodward County, Oklahoma
Oklahoma state record, from OK_wells_rbdms-wells.parquet. Corpus built 2026-09-11.