Well 2SB, UNIVERSITY BLK.9 /WOLFCAMP/ UNIT, Andrews County, Texas

API 00305165 — recorded on 4 leases.

Plugged Jun 11 2026On the RRC proration schedule1 frac disclosureSave
Total depth
10,600 ft
Last completion
Apr 22 2026
as filed
Leases
4
Records
5
wellbore filings

Leases

LeaseWell no.OperatorFieldSchedule
UNIVERSITY BLK.9 /WOLFCAMP/ UNIT2SBXTO ENERGY INC.UNIVERSITY BLOCK 9 (WOLFCAMP)On
UNIVERSITY BLOCK 9 /PENN/ UNIT262 numbers filedXTO ENERGY INC.UNIVERSITY BLOCK 9 (PENN.)On
UNIVERSITY "9" -B-2XTO ENERGY INC.TRIPLE-N (GRAYBURG)On
UNIVERSITY BLOCK 92BXTO ENERGY INC.UNIVERSITY BLOCK 9 (DEVONIAN)On

The hole

Total depth
10,600 ft
Casing strings
16
Deepest casing
9,248 ft
Survey
UNIVERSITY LAND
Abstract
not filed
Block / section
9 / 15
Plugging records
not filed
Bottom hole location
32.19094, -102.57843
32.19094, -102.57843 · NAD83, as filed

Drilling permits

From the Railroad Commission's drilling permit master — the application record, not a record of drilling. A permit is an application the Commission filed and numbered; the spud date is the only field here that says a hole was started. This file carries no approval status, so none is shown.

Permits
3
First issued
Jan 29 1999
to Jun 14 2011
With a spud date
3
last Mar 24 2011
Deepest permitted
10,800 ft
as applied for
PermitIssuedTypeLeaseDepthSpud
718061Jun 14 2011RecompletionhorizontalUNIVERSITY BLK 9no. 2B10,800 ftMar 24 2011
526921Jan 7 2003RecompletionUNIVERSITY "9" -B-no. 25,800 ftNov 4 2002
482282Jan 29 1999RecompletionUNIVERSITY BLOCK 9/PENN/UNITno. 269,250 ftNov 27 1998

What the lease produced

Texas reports oil and gas by lease, never by wellbore, so this is the whole lease. Values are volume multiplied by the published monthly price, the same arithmetic the lease page shows in full.

Hydraulic fracturing

Disclosed to FracFocus, the registry Texas designates by statute (Natural Resources Code §91.851; 16 TAC §3.29). FracFocus is run by the Ground Water Protection Council and the Interstate Oil and Gas Compact Commission, not by a state agency — but the filing itself is required by Texas rule.

Disclosures
1
First job
Nov 29 2011
Last job
Nov 29 2011
Water, as filed
operator-reported, not converted