Well 9, AMOCO-COLLIER ESTATE, Crosby County, Texas

API 10730459 — recorded on 1 lease.

Plugged Dec 7 2020On the RRC proration schedule1 frac disclosureSave
Total depth
3,990 ft
Last completion
Jun 19 2018
as filed
Leases
1
Records
1
wellbore filings

Leases

LeaseWell no.OperatorFieldSchedule
AMOCO-COLLIER ESTATE9BRIDWELL OIL CO.RIDGE, SOUTH (GLORIETA)On

The hole

Total depth
3,990 ft
Casing strings
5
Deepest casing
3,990 ft
Survey
not filed
Abstract
not filed
Block / section
not filed
Plugging records
4
Bottom hole location
33.44981, -101.44370
33.44981, -101.44370 · NAD83, as filed

Drilling permits

From the Railroad Commission's drilling permit master — the application record, not a record of drilling. A permit is an application the Commission filed and numbered; the spud date is the only field here that says a hole was started. This file carries no approval status, so none is shown.

Permits
1
First issued
Feb 25 1980
With a spud date
1
last Mar 16 1980
Deepest permitted
4,000 ft
as applied for
PermitIssuedTypeLeaseDepthSpud
73401Feb 25 1980DrillAMOCO-COLLIER ESTATEno. 94,000 ftMar 16 1980

What the lease produced

Texas reports oil and gas by lease, never by wellbore, so this is the whole lease. Values are volume multiplied by the published monthly price, the same arithmetic the lease page shows in full.

Hydraulic fracturing

Disclosed to FracFocus, the registry Texas designates by statute (Natural Resources Code §91.851; 16 TAC §3.29). FracFocus is run by the Ground Water Protection Council and the Interstate Oil and Gas Compact Commission, not by a state agency — but the filing itself is required by Texas rule.

Disclosures
1
First job
Nov 26 2013
Last job
Nov 26 2013
Water, as filed
25,149 gal
operator-reported, not converted