Well 3, STROEBEL, C.W., Eastland County, Texas

API 13333128 — recorded on 1 lease.

Plugged Oct 31 2017On the RRC proration scheduleSave
Total depth
1,396 ft
Last completion
Jul 9 1981
as filed
Leases
1
Records
1
wellbore filings

Leases

LeaseWell no.OperatorFieldSchedule
STROEBEL, C.W.3SHILYNN, INC.MADEWELL (CROSS CUT)On

The hole

Total depth
1,396 ft
Casing strings
2
Deepest casing
1,395 ft
Survey
H&TC RR CO. A-183
Abstract
not filed
Block / section
3 / 111
Plugging records
3
Bottom hole location
32.28475, -99.05677
32.28475, -99.05677 · NAD83, as filed

Drilling permits

From the Railroad Commission's drilling permit master — the application record, not a record of drilling. A permit is an application the Commission filed and numbered; the spud date is the only field here that says a hole was started. This file carries no approval status, so none is shown.

Permits
1
First issued
Jun 29 1981
With a spud date
none filed
Deepest permitted
2,000 ft
as applied for
PermitIssuedTypeLeaseDepthSpud
122957Jun 29 1981DrillSTROEBEL, C.W.no. 32,000 ftnot filed

What the lease produced

Texas reports oil and gas by lease, never by wellbore, so this is the whole lease. Values are volume multiplied by the published monthly price, the same arithmetic the lease page shows in full.