Well 97, ROUND TOP /PALO PINTO REEF/, Fisher County, Texas
API 15101217 — recorded on 3 leases.
Total depth
4,868 ft
Last completion
Jan 9 1985
as filed
Leases
3
1 with no page
Records
3
wellbore filings
Leases
| Lease | Well no. | Operator | Field | Schedule |
|---|---|---|---|---|
| ROUND TOP /PALO PINTO REEF/ | 97 | L.C.S. PRODUCTION COMPANY | ROUND TOP (PALO PINTO REEF) | On |
| RTCS D | 41 | L.C.S. PRODUCTION COMPANY | ROUND TOP (CANYON) | On |
| MERRY BROTHERS & PERINI, ETALno production filed | 3 | CONTINENTAL OIL COMPANY | ROUND TOP (PALO PINTO REEF) | On |
The hole
- Total depth
- 4,868 ft
- Casing strings
- 2
- Deepest casing
- 4,860 ft
- Survey
- H & TC RR CO.
- Abstract
- not filed
- Block / section
- 1 / 80
- Plugging records
- 4
- Bottom hole location
- 32.86625, -100.28513
32.86625, -100.28513 · NAD83, as filed⌘ or Ctrl + scroll to zoom
Drilling permits
From the Railroad Commission's drilling permit master — the application record, not a record of drilling. A permit is an application the Commission filed and numbered; the spud date is the only field here that says a hole was started. This file carries no approval status, so none is shown.
Permits
1
First issued
Oct 3 1984
With a spud date
—
none filed
Deepest permitted
4,878 ft
as applied for
| Permit | Issued | Type | Lease | Depth | Spud |
|---|---|---|---|---|---|
| 253421 | Oct 3 1984 | Recompletion | ROUND TOP CANYON(CANYON SAND)UNIno. 41 | 4,878 ft | not filed |
What the lease produced
Texas reports oil and gas by lease, never by wellbore, so this is the whole lease. Values are volume multiplied by the published monthly price, the same arithmetic the lease page shows in full.