Well 1, NEAL, BILL "322", Hardeman County, Texas
API 19730374 — recorded on 1 lease.
Well API 19730374 is recorded on the NEAL, BILL "322" lease in Hardeman County, Texas, operated by KEY ENERGY OF COLORADO, INC.. The state files a total depth of 8,278 ft, a last completion filed Jan 11 1981 and 1 drilling permit. A plugging record was filed Oct 14 1999.
Leases
| Lease | Well no. | Operator | Field | Schedule |
|---|---|---|---|---|
| NEAL, BILL "322" | 1 | KEY ENERGY OF COLORADO, INC. | RAPPS (CONGL) | On |
The hole
- Total depth
- 8,278 ft
- Casing strings
- 3
- Deepest casing
- 8,277 ft
- Survey
- not filed
- Abstract
- not filed
- Block / section
- not filed
- Plugging records
- 4
- Bottom hole location
- 34.12324, -99.62059
Drilling permits
From the Railroad Commission's drilling permit master — the application record, not a record of drilling. A permit is an application the Commission filed and numbered; the spud date is the only field here that says a hole was started. This file carries no approval status, so none is shown.
| Permit | Issued | Type | Lease | Depth | Spud |
|---|---|---|---|---|---|
| 98760 | Nov 12 1980 | Drill | NEAL, BILL "322"no. 1 | 8,500 ft | Nov 13 1980 |
What the lease produced
Texas reports oil and gas by lease, never by wellbore, so this is the whole lease. Values are volume multiplied by the published monthly price, the same arithmetic the lease page shows in full.