Well 4, ABNEY, C.M. UNIT 1, Harrison County, Texas
API 20330488 — recorded on 3 leases.
Well API 20330488 is recorded on the ABNEY, C.M. UNIT 1 lease in Harrison County, Texas, operated by DEVON ENERGY PRODUCTION CO, L.P.. The state files a total depth of 9,650 ft, a last completion filed Aug 17 1994 and 3 drilling permits. A plugging record was filed Jul 12 2011.
Leases
| Lease | Well no. | Operator | Field | Schedule |
|---|---|---|---|---|
| ABNEY, C.M. UNIT 1 | 4 | DEVON ENERGY PRODUCTION CO, L.P. | WASKOM, (TRAVIS PEAK, UPPER) | On |
| ABNEY GAS UNIT #1no production filed | 4 | MOBIL PRODUCING TX. & N.M. INC. | WASKOM (COTTON VALLEY) | On |
| ABNEY GAS UNIT #1no production filed | 4 | SCANA PETROLEUM RESOURCES, INC. | WILDCAT | On |
The hole
- Total depth
- 9,650 ft
- Casing strings
- 8
- Deepest casing
- 9,640 ft
- Survey
- S. HOLLOWAY
- Abstract
- 295
- Block / section
- not filed
- Plugging records
- 5
- Bottom hole location
- 32.44157, -94.12095
Drilling permits
From the Railroad Commission's drilling permit master — the application record, not a record of drilling. A permit is an application the Commission filed and numbered; the spud date is the only field here that says a hole was started. This file carries no approval status, so none is shown.
| Permit | Issued | Type | Lease | Depth | Spud |
|---|---|---|---|---|---|
| 425838 | Jul 26 1994 | Recompletion | ABNEY UNIT #1no. 4 | 6,060 ft | Aug 3 1994 |
| 361613 | Jun 19 1989 | Recompletion | ABNEY, C. M.no. 104 | 7,870 ft | Aug 18 1989 |
| 3936 | Aug 3 1977 | Drill | ABNEY UNIT #1 GASno. 4 | 9,700 ft | Sep 24 1977 |
What the lease produced
Texas reports oil and gas by lease, never by wellbore, so this is the whole lease. Values are volume multiplied by the published monthly price, the same arithmetic the lease page shows in full.