Well 1, PRIMERO 42, Howard County, Texas
API 22736175 — recorded on 4 leases.
Total depth
9,550 ft
Last completion
Nov 29 2008
as filed
Leases
4
2 with no page
Records
5
wellbore filings
Leases
| Lease | Well no. | Operator | Field | Schedule |
|---|---|---|---|---|
| PRIMERO 42 | 1 | SHARP IMAGE ENERGY, INC. | PRIMERO (WOLFCAMP, UPPER) | On |
| PRIMERO 42 | 1 | SHARP IMAGE ENERGY, INC. | SPRABERRY (TREND AREA) | Off |
| PRIMERO 42no production filed | 1 | SHARP IMAGE ENERGY, INC. | PRIMERO (WOLFCAMP, UPPER) | On |
| PRIMERO 42no production filed | 1 | SHARP IMAGE ENERGY, INC. | BIG SPRING (FUSSELMAN) | Off |
The hole
- Total depth
- 9,550 ft
- Casing strings
- 8
- Deepest casing
- 9,531 ft
- Survey
- T&P RR CO/MORGAN, J R
- Abstract
- 1306
- Block / section
- 31 T1N / 42
- Plugging records
- not filed
- Bottom hole location
- 32.29122, -101.39079
32.29122, -101.39079 · NAD83, as filed⌘ or Ctrl + scroll to zoom
Drilling permits
From the Railroad Commission's drilling permit master — the application record, not a record of drilling. A permit is an application the Commission filed and numbered; the spud date is the only field here that says a hole was started. This file carries no approval status, so none is shown.
Permits
4
First issued
Aug 7 2008
to Jun 6 2016
With a spud date
3
last Oct 28 2008
Deepest permitted
10,000 ft
as applied for
| Permit | Issued | Type | Lease | Depth | Spud |
|---|---|---|---|---|---|
| 816076 | Jun 6 2016 | Recompletion | PRIMERO 42no. 1 | 10,000 ft | not filed |
| 775396 | Dec 27 2013 | Recompletion | PRIMERO 42no. 1 | 10,000 ft | Oct 28 2008 |
| 773628 | Nov 22 2013 | Field transfer | PRIMERO 42no. 1 | 10,000 ft | Sep 24 2008 |
| 667201 | Aug 7 2008 | Drill | PRIMERO 42no. 1 | 10,000 ft | Sep 24 2008 |
What the lease produced
Texas reports oil and gas by lease, never by wellbore, so this is the whole lease. Values are volume multiplied by the published monthly price, the same arithmetic the lease page shows in full.