Well 1, FENNER "B", Jackson County, Texas
API 23932680 — recorded on 4 leases.
Well API 23932680 is recorded on the FENNER "B" lease in Jackson County, Texas, operated by CHAPARRAL (USA) ENERGY, INC.. The state files a total depth of 4,810 ft, a last completion filed Sep 9 1999 and 3 drilling permits. A plugging record was filed Oct 27 2010.
Leases
| Lease | Well no. | Operator | Field | Schedule |
|---|---|---|---|---|
| FENNER "B" | 1 | CHAPARRAL (USA) ENERGY, INC. | FENNER (FRIO 3450) | On |
| FENNER "B" | 1 | CHAPARRAL ENERGY, L.L.C. | WILDCAT | On |
| FENNER "B"no production filed | 1 | CHAPARRAL ENERGY, L.L.C. | MORALES (2500) | On |
| FENNER "B"no production filed | 1 | CHAPARRAL ENERGY, L.L.C. | WILDCAT | On |
The hole
- Total depth
- 4,810 ft
- Casing strings
- 8
- Deepest casing
- 3,770 ft
- Survey
- I & GN RR CO.
- Abstract
- 173
- Block / section
- 1 / 3
- Plugging records
- 1
- Bottom hole location
- 29.17459, -96.67752
Drilling permits
From the Railroad Commission's drilling permit master — the application record, not a record of drilling. A permit is an application the Commission filed and numbered; the spud date is the only field here that says a hole was started. This file carries no approval status, so none is shown.
| Permit | Issued | Type | Lease | Depth | Spud |
|---|---|---|---|---|---|
| 518498 | Mar 22 2002 | Recompletion | FENNER "B"no. 1 | 3,729 ft | Sep 9 1999 |
| 480331 | Dec 11 1998 | Recompletion | FENNER "B"no. 1 | 3,729 ft | Oct 2 1998 |
| 407803 | Dec 31 1992 | Drill | FENNER "B"no. 1 | 5,000 ft | Jan 29 1993 |
What the lease produced
Texas reports oil and gas by lease, never by wellbore, so this is the whole lease. Values are volume multiplied by the published monthly price, the same arithmetic the lease page shows in full.