Well 3, THOMPSON, Jones County, Texas
API 25334615 — recorded on 1 lease.
Well API 25334615 is recorded on the THOMPSON lease in Jones County, Texas, operated by SMITH PIPE OF ABILENE. The state files a total depth of 3,700 ft, a last completion filed Nov 14 2003 and 1 drilling permit. A plugging record was filed Feb 24 2011.
Leases
| Lease | Well no. | Operator | Field | Schedule |
|---|---|---|---|---|
| THOMPSON | 3 | SMITH PIPE OF ABILENE | TONY P. (SWASTIKA) | On |
The hole
- Total depth
- 3,700 ft
- Casing strings
- 2
- Deepest casing
- 3,699 ft
- Survey
- J. S. HAIL #3
- Abstract
- 536
- Block / section
- not filed
- Plugging records
- 3
- Bottom hole location
- 32.90707, -100.12917
Drilling permits
From the Railroad Commission's drilling permit master — the application record, not a record of drilling. A permit is an application the Commission filed and numbered; the spud date is the only field here that says a hole was started. This file carries no approval status, so none is shown.
| Permit | Issued | Type | Lease | Depth | Spud |
|---|---|---|---|---|---|
| 534139 | Jul 14 2003 | Drill | THOMPSONno. 3 | 3,800 ft | Jul 15 2003 |
What the lease produced
Texas reports oil and gas by lease, never by wellbore, so this is the whole lease. Values are volume multiplied by the published monthly price, the same arithmetic the lease page shows in full.