Well 2, BRUNSON "B", Loving County, Texas

API 30131141 — recorded on 4 leases.

No plugging record filedOn the RRC proration schedule1 frac disclosureSave
Total depth
16,800 ft
Last completion
Oct 18 2012
as filed
Leases
4
Records
4
wellbore filings

Leases

LeaseWell no.OperatorFieldSchedule
BRUNSON "B"2WILLIAMS, CLAYTON ENERGY, INC.KENNEDY, BILL(ATOKA STRAWN CONS)On
BRUNSON "B"2WILLIAMS, CLAYTON ENERGY, INC.SLASH RANCH (WOLFCAMP)On
BRUNSON 'B'2COG OPERATING LLCTWO GEORGES (BONE SPRING)On
BRUNSON 'B'2COG OPERATING LLCSANDBAR (BONE SPRING)Off

The hole

Total depth
16,800 ft
Casing strings
15
Deepest casing
12,940 ft
Survey
PSL / BRUNSON, G S
Abstract
1009
Block / section
C26 / 4
Plugging records
not filed
Bottom hole location
31.88870, -103.45580
31.88870, -103.45580 · NAD83, as filed

Drilling permits

From the Railroad Commission's drilling permit master — the application record, not a record of drilling. A permit is an application the Commission filed and numbered; the spud date is the only field here that says a hole was started. This file carries no approval status, so none is shown.

Permits
4
5 records, 1 revisions
First issued
Aug 20 2003
to May 29 2020
With a spud date
4
last Sep 5 2012
Deepest permitted
17,000 ft
as applied for
PermitIssuedTypeLeaseDepthSpud
863674May 29 2020Field transferBRUNSON 'B'no. 216,800 ftSep 5 2012
750037Oct 23 2012RecompletionBRUNSON 'B'no. 216,800 ftSep 5 2012
728559Nov 22 2011RecompletionBRUNSON 'B'no. 216,800 ftNov 15 2011
5355732 recordsAug 20 2003DrillBRUNSON Bno. 217,000 ftOct 29 2003

What the lease produced

Texas reports oil and gas by lease, never by wellbore, so this is the whole lease. Values are volume multiplied by the published monthly price, the same arithmetic the lease page shows in full.

Hydraulic fracturing

Disclosed to FracFocus, the registry Texas designates by statute (Natural Resources Code §91.851; 16 TAC §3.29). FracFocus is run by the Ground Water Protection Council and the Interstate Oil and Gas Compact Commission, not by a state agency — but the filing itself is required by Texas rule.

Disclosures
1
First job
Oct 9 2012
Last job
Oct 9 2012
Water, as filed
1,373,519 gal
operator-reported, not converted