Well 1, FIRST UNITED METHODIST CHURCH-B-, Midland County, Texas
API 32930927 — recorded on 3 leases.
Total depth
11,395 ft
Last completion
Mar 28 2018
as filed
Leases
3
1 with no page
Records
3
wellbore filings
Leases
| Lease | Well no. | Operator | Field | Schedule |
|---|---|---|---|---|
| FIRST UNITED METHODIST CHURCH-B- | 1 | TEXACO E & P INC. | BRADFORD RANCH (STRAWN) | On |
| FIRST UNITED METHODIST CHURCH B | 1 | CHEVRON U. S. A. INC. | SPRABERRY (TREND AREA) | Off |
| FIRST UNITED METHODIST CHURCH -Bno production filed | 1 | TEXACO INC. | BRADFORD RANCH (ATOKA) | On |
The hole
- Total depth
- 11,395 ft
- Casing strings
- 13
- Deepest casing
- 11,033 ft
- Survey
- T&P RR CO./J.A. LANIER
- Abstract
- 795
- Block / section
- 39, T-3-S / 12
- Plugging records
- not filed
- Bottom hole location
- 31.84153, -102.00254
31.84153, -102.00254 · NAD83, as filed⌘ or Ctrl + scroll to zoom
Drilling permits
From the Railroad Commission's drilling permit master — the application record, not a record of drilling. A permit is an application the Commission filed and numbered; the spud date is the only field here that says a hole was started. This file carries no approval status, so none is shown.
Permits
3
4 records, 1 revisions
First issued
Aug 18 1980
to Apr 1 1996
With a spud date
2
last Apr 23 1998
Deepest permitted
11,460 ft
as applied for
| Permit | Issued | Type | Lease | Depth | Spud |
|---|---|---|---|---|---|
| 4465212 records | Apr 1 1996 | Recompletion | FIRST UNITED METHODIST CHURCH Bno. 1 | 11,395 ft | Apr 23 1998 |
| 332799 | Jul 15 1987 | Recompletion | FIRST UNITED METHODIST CHURCH-B-no. 1 | 10,780 ft | not filed |
| 90034 | Aug 18 1980 | Drill | FIRST UNITED METHODIST CHURCH"B"no. 1 | 11,460 ft | Oct 11 1980 |
What the lease produced
Texas reports oil and gas by lease, never by wellbore, so this is the whole lease. Values are volume multiplied by the published monthly price, the same arithmetic the lease page shows in full.