Well 115, HOPPE, ELEANOR, Midland County, Texas
API 32936399 — recorded on 2 leases.
Total depth
10,810 ft
Last completion
Feb 23 2011
as filed
Leases
2
Records
2
wellbore filings
Leases
| Lease | Well no. | Operator | Field | Schedule |
|---|---|---|---|---|
| HOPPE, ELEANOR | 115 | TRIGEO ENERGY, LLC | SPRABERRY (TREND AREA) | On |
| FEE "AT" | 1115 | FASKEN OIL AND RANCH, LTD. | SPRABERRY (TREND AREA) | Off |
The hole
- Total depth
- 10,810 ft
- Casing strings
- 4
- Deepest casing
- 10,787 ft
- Survey
- T&P RR CO
- Abstract
- 246
- Block / section
- 40 T1S / 11
- Plugging records
- not filed
- Bottom hole location
- 32.05144, -102.19626
32.05144, -102.19626 · NAD83, as filed⌘ or Ctrl + scroll to zoom
Drilling permits
From the Railroad Commission's drilling permit master — the application record, not a record of drilling. A permit is an application the Commission filed and numbered; the spud date is the only field here that says a hole was started. This file carries no approval status, so none is shown.
Permits
1
First issued
Dec 3 2009
With a spud date
1
last Jan 10 2010
Deepest permitted
11,200 ft
as applied for
| Permit | Issued | Type | Lease | Depth | Spud |
|---|---|---|---|---|---|
| 686662 | Dec 3 2009 | Drill | FEE "AT"no. 1115 | 11,200 ft | Jan 10 2010 |
What the lease produced
Texas reports oil and gas by lease, never by wellbore, so this is the whole lease. Values are volume multiplied by the published monthly price, the same arithmetic the lease page shows in full.