Well 115, HOPPE, ELEANOR, Midland County, Texas
API 32936399 — recorded on 2 leases.
Well API 32936399 is recorded on the HOPPE, ELEANOR lease in Midland County, Texas, operated by TRIGEO ENERGY, LLC. The state files a total depth of 10,810 ft, a last completion filed Feb 23 2011 and 1 drilling permit. The state holds no plugging record for it.
Leases
| Lease | Well no. | Operator | Field | Schedule |
|---|---|---|---|---|
| HOPPE, ELEANOR | 115 | TRIGEO ENERGY, LLC | SPRABERRY (TREND AREA) | On |
| FEE "AT" | 1115 | FASKEN OIL AND RANCH, LTD. | SPRABERRY (TREND AREA) | Off |
The hole
- Total depth
- 10,810 ft
- Casing strings
- 4
- Deepest casing
- 10,787 ft
- Survey
- T&P RR CO
- Abstract
- 246
- Block / section
- 40 T1S / 11
- Plugging records
- not filed
- Bottom hole location
- 32.05144, -102.19626
Drilling permits
From the Railroad Commission's drilling permit master — the application record, not a record of drilling. A permit is an application the Commission filed and numbered; the spud date is the only field here that says a hole was started. This file carries no approval status, so none is shown.
| Permit | Issued | Type | Lease | Depth | Spud |
|---|---|---|---|---|---|
| 686662 | Dec 3 2009 | Drill | FEE "AT"no. 1115 | 11,200 ft | Jan 10 2010 |
What the lease produced
Texas reports oil and gas by lease, never by wellbore, so this is the whole lease. Values are volume multiplied by the published monthly price, the same arithmetic the lease page shows in full.