Well H120MX, CHARGER 120 MIPA UNIT, Midland County, Texas

API 32942351 — recorded on 1 lease.

Well API 32942351 is recorded on the CHARGER 120 MIPA UNIT lease in Midland County, Texas, operated by PERMIAN DEEP ROCK OIL CO., LLC. The state files a total depth of 8,335 ft, a last completion filed Apr 24 2025, 2 drilling permits and 1 hydraulic fracturing disclosure. The state holds no plugging record for it.

No plugging record filed1 frac disclosureSave
Total depth
8,335 ft
Last completion
Apr 24 2025
as filed
Leases
1
Records
2
wellbore filings

Leases

LeaseWell no.OperatorFieldSchedule
CHARGER 120 MIPA UNITH120MXPERMIAN DEEP ROCK OIL CO., LLCSPRABERRY (TREND AREA)Off

The hole

Total depth
8,335 ft
Casing strings
3
Deepest casing
21,488 ft
Survey
T&P RR CO / MC CLINTIC, H
Abstract
670
Block / section
39 T2S / 10
Plugging records
not filed
Bottom hole location
32.00414, -102.09144
32.00414, -102.09144 · NAD83, as filed

Drilling permits

From the Railroad Commission's drilling permit master — the application record, not a record of drilling. A permit is an application the Commission filed and numbered; the spud date is the only field here that says a hole was started. This file carries no approval status, so none is shown.

Permits
2
5 records, 3 revisions
First issued
Mar 7 2018
to Mar 15 2022
With a spud date
1
last Jan 22 2024
Deepest permitted
8,500 ft
as applied for
PermitIssuedTypeLeaseDepthSpud
8778543 recordsMar 15 2022DrillhorizontalCHARGER 120 MIPA UNITno. H120MX8,500 ftJan 22 2024
8370062 recordsMar 7 2018DrillhorizontalCHARGERno. H120MS8,500 ftnot filed

What the lease produced

Texas reports oil and gas by lease, never by wellbore, so this is the whole lease. Values are volume multiplied by the published monthly price, the same arithmetic the lease page shows in full.

Hydraulic fracturing

Disclosed to FracFocus, the registry Texas designates by statute (Natural Resources Code §91.851; 16 TAC §3.29). FracFocus is run by the Ground Water Protection Council and the Interstate Oil and Gas Compact Commission, not by a state agency — but the filing itself is required by Texas rule.

Disclosures
1
First job
Mar 20 2025
Last job
Mar 20 2025
Water, as filed
20,778,454 gal
operator-reported, not converted