Well 3 A, RIEBE, ANGELINA, Palo Pinto County, Texas

API 36333785 — recorded on 3 leases.

Plugged Apr 12 2023On the RRC proration scheduleSave
Total depth
4,100 ft
Last completion
Jul 30 1991
as filed
Leases
3
1 with no page
Records
4
wellbore filings

Leases

LeaseWell no.OperatorFieldSchedule
RIEBE, ANGELINA3 AHUNTER ENERGY, INC.JOHNSTON GAP (MARBLE FALLS)On
RIEBE, ANGELINA3AHUNTER ENERGY, INC.JOHNSTON GAP (MARBLE FALLS)On
RIEBE,ANGELINAno production filed3ARED TOP ENERGY, INC.ROBL (CONGLOMERATE)On

The hole

Total depth
4,100 ft
Casing strings
6
Deepest casing
4,100 ft
Survey
T&P RR CO
Abstract
1401
Block / section
3 / 59
Plugging records
3
Bottom hole location
32.68598, -98.46660
32.68598, -98.46660 · NAD83, as filed

Drilling permits

From the Railroad Commission's drilling permit master — the application record, not a record of drilling. A permit is an application the Commission filed and numbered; the spud date is the only field here that says a hole was started. This file carries no approval status, so none is shown.

Permits
3
First issued
Dec 2 1986
to Dec 3 1992
With a spud date
1
last Jul 11 1991
Deepest permitted
4,200 ft
as applied for
PermitIssuedTypeLeaseDepthSpud
404669Dec 3 1992RecompletionRIEBE, ANGELINAno. 3A4,100 ftJul 11 1991
366407Nov 15 1989RecompletionRIEBEno. 3A4,055 ftnot filed
323630Dec 2 1986DrillRIEBEno. 3A4,200 ftnot filed

What the lease produced

Texas reports oil and gas by lease, never by wellbore, so this is the whole lease. Values are volume multiplied by the published monthly price, the same arithmetic the lease page shows in full.