Well 5, UNDER THE HILL, Palo Pinto County, Texas

API 36335551 — recorded on 1 lease.

Well API 36335551 is recorded on the UNDER THE HILL lease in Palo Pinto County, Texas, operated by CHOLLA PETROLEUM, INC.. The state files a total depth of 4,421 ft, a last completion filed Aug 1 2006 and 1 drilling permit. A plugging record was filed May 4 2018.

Plugged May 4 2018On the RRC proration scheduleSave
Total depth
4,421 ft
Last completion
Aug 1 2006
as filed
Leases
1
Records
1
wellbore filings

Leases

LeaseWell no.OperatorFieldSchedule
UNDER THE HILL5CHOLLA PETROLEUM, INC.POSSUM KINGDOM (CONGL.)On

The hole

Total depth
4,421 ft
Casing strings
3
Deepest casing
4,421 ft
Survey
BS&F
Abstract
107
Block / section
1
Plugging records
5
Bottom hole location
32.88842, -98.55944
32.88842, -98.55944 · NAD83, as filed

Drilling permits

From the Railroad Commission's drilling permit master — the application record, not a record of drilling. A permit is an application the Commission filed and numbered; the spud date is the only field here that says a hole was started. This file carries no approval status, so none is shown.

Permits
1
First issued
May 26 2006
With a spud date
none filed
Deepest permitted
4,999 ft
as applied for
PermitIssuedTypeLeaseDepthSpud
620022May 26 2006DrillUNDER THE HILLno. 54,999 ftnot filed

What the lease produced

Texas reports oil and gas by lease, never by wellbore, so this is the whole lease. Values are volume multiplied by the published monthly price, the same arithmetic the lease page shows in full.