Well 2, KICKAPOO CREEK GAS UNIT, Smith County, Texas

API 42331518 — recorded on 2 leases.

Well API 42331518 is recorded on the KICKAPOO CREEK GAS UNIT lease in Smith County, Texas, operated by FAULCONER ENERGY, LLC. The state files a total depth of 11,840 ft, a last completion filed Feb 22 2025, 2 drilling permits and 1 hydraulic fracturing disclosure. The state holds no plugging record for it.

No plugging record filedOn the RRC proration schedule1 frac disclosureSave
Total depth
11,840 ft
Last completion
Feb 22 2025
as filed
Leases
2
Records
2
wellbore filings

Leases

LeaseWell no.OperatorFieldSchedule
KICKAPOO CREEK GAS UNIT2FAULCONER ENERGY, LLCOVERTON (COTTON VALLEY SAND)On
KICKAPOO CREEK TP2FAULCONER ENERGY, LLCOVERTON (TRAVIS PEAK)Off

The hole

Total depth
11,840 ft
Casing strings
5
Deepest casing
11,840 ft
Survey
LIVELY, P
Abstract
567
Block / section
not filed
Plugging records
not filed
Bottom hole location
32.17372, -95.09077
32.17372, -95.09077 · NAD83, as filed

Drilling permits

From the Railroad Commission's drilling permit master — the application record, not a record of drilling. A permit is an application the Commission filed and numbered; the spud date is the only field here that says a hole was started. This file carries no approval status, so none is shown.

Permits
2
First issued
May 3 1999
to Jun 7 2023
With a spud date
1
last Feb 11 2001
Deepest permitted
11,900 ft
as applied for
PermitIssuedTypeLeaseDepthSpud
890855Jun 7 2023RecompletionKICKAPOO CREEK TPno. 211,840 ftnot filed
483447May 3 1999DrillKICKAPOO CREEK GAS UNIT 1no. 211,900 ftFeb 11 2001

What the lease produced

Texas reports oil and gas by lease, never by wellbore, so this is the whole lease. Values are volume multiplied by the published monthly price, the same arithmetic the lease page shows in full.

Hydraulic fracturing

Disclosed to FracFocus, the registry Texas designates by statute (Natural Resources Code §91.851; 16 TAC §3.29). FracFocus is run by the Ground Water Protection Council and the Interstate Oil and Gas Compact Commission, not by a state agency — but the filing itself is required by Texas rule.

Disclosures
1
First job
Feb 13 2025
Last job
Feb 13 2025
Water, as filed
180,671 gal
operator-reported, not converted