Well 100JM, ADELY 50, Upton County, Texas

API 46142207 — recorded on 1 lease.

Well API 46142207 is recorded on the ADELY 50 lease in Upton County, Texas, operated by SUMMIT PETROLEUM LLC. The state files a total depth of 8,212 ft, a last completion filed Jun 30 2023, 1 drilling permit and 1 hydraulic fracturing disclosure. The state holds no plugging record for it.

No plugging record filed1 frac disclosureSave
Total depth
8,212 ft
Last completion
Jun 30 2023
as filed
Leases
1
Records
1
wellbore filings

Leases

LeaseWell no.OperatorFieldSchedule
ADELY 50100JMSUMMIT PETROLEUM LLCSPRABERRY (TREND AREA)Off

The hole

Total depth
8,212 ft
Casing strings
8
Deepest casing
21,174 ft
Survey
CCSD&RGNG RR CO
Abstract
29
Block / section
C / 37
Plugging records
not filed
Bottom hole location
31.42532, -101.98371
31.42532, -101.98371 · NAD83, as filed

Drilling permits

From the Railroad Commission's drilling permit master — the application record, not a record of drilling. A permit is an application the Commission filed and numbered; the spud date is the only field here that says a hole was started. This file carries no approval status, so none is shown.

Permits
1
First issued
Aug 29 2022
With a spud date
1
last Aug 31 2022
Deepest permitted
8,800 ft
as applied for
PermitIssuedTypeLeaseDepthSpud
882986Aug 29 2022DrillhorizontalADELY 50no. 100JM8,800 ftAug 31 2022

What the lease produced

Texas reports oil and gas by lease, never by wellbore, so this is the whole lease. Values are volume multiplied by the published monthly price, the same arithmetic the lease page shows in full.

Hydraulic fracturing

Disclosed to FracFocus, the registry Texas designates by statute (Natural Resources Code §91.851; 16 TAC §3.29). FracFocus is run by the Ground Water Protection Council and the Interstate Oil and Gas Compact Commission, not by a state agency — but the filing itself is required by Texas rule.

Disclosures
1
First job
Feb 22 2023
Last job
Feb 22 2023
Water, as filed
25,665,525 gal
operator-reported, not converted