Well 1, JILL 54, Wheeler County, Texas

API 48331929 — recorded on 2 leases.

Well API 48331929 is recorded on the JILL 54 lease in Wheeler County, Texas, operated by BP AMERICA PRODUCTION COMPANY. The state files a total depth of 16,587 ft, a last completion filed Sep 21 2012, 2 drilling permits and 1 hydraulic fracturing disclosure. The state holds no plugging record for it.

No plugging record filedOn the RRC proration schedule1 frac disclosureSave
Total depth
16,587 ft
Last completion
Sep 21 2012
as filed
Leases
2
Records
2
wellbore filings

Leases

LeaseWell no.OperatorFieldSchedule
JILL 541BP AMERICA PRODUCTION COMPANYMILLS RANCH (ATOKA)On
JILL 541MMGL TXPH, LLCMILLS RANCH (ATOKA GRANITE WASH)Off

The hole

Total depth
16,587 ft
Casing strings
9
Deepest casing
16,572 ft
Survey
H&GN RR CO/ PURCELL, J D
Abstract
8391
Block / section
A7 / 54
Plugging records
not filed
Bottom hole location
35.38282, -100.00908
35.38282, -100.00908 · NAD83, as filed

Drilling permits

From the Railroad Commission's drilling permit master — the application record, not a record of drilling. A permit is an application the Commission filed and numbered; the spud date is the only field here that says a hole was started. This file carries no approval status, so none is shown.

Permits
2
First issued
Aug 23 2005
to Feb 10 2011
With a spud date
2
last Sep 12 2012
Deepest permitted
17,000 ft
as applied for
PermitIssuedTypeLeaseDepthSpud
709562Feb 10 2011RecompletionJILL 54no. 116,593 ftSep 12 2012
605364Aug 23 2005DrillJILL 54no. 117,000 ftNov 10 2005

What the lease produced

Texas reports oil and gas by lease, never by wellbore, so this is the whole lease. Values are volume multiplied by the published monthly price, the same arithmetic the lease page shows in full.

Hydraulic fracturing

Disclosed to FracFocus, the registry Texas designates by statute (Natural Resources Code §91.851; 16 TAC §3.29). FracFocus is run by the Ground Water Protection Council and the Interstate Oil and Gas Compact Commission, not by a state agency — but the filing itself is required by Texas rule.

Disclosures
1
First job
Jan 12 2012
Last job
Jan 12 2012
Water, as filed
operator-reported, not converted