Well 1, URIBE, P., Zapata County, Texas
API 50531817 — recorded on 2 leases.
Total depth
12,100 ft
Last completion
Dec 3 1990
as filed
Leases
2
1 with no page
Records
2
wellbore filings
Leases
| Lease | Well no. | Operator | Field | Schedule |
|---|---|---|---|---|
| URIBE, P. | 1 | ENRON OIL & GAS COMPANY | POK - A - DOT (8600) | On |
| URIBE, ARCO P.no production filed | 1 | ARCO OIL & GAS CO. | LAS OVEJAS, SW (LOBO) | On |
The hole
- Total depth
- 12,100 ft
- Casing strings
- 4
- Deepest casing
- 7,990 ft
- Survey
- JOSE VASQUEZ BOREGO
- Abstract
- 209
- Block / section
- not filed
- Plugging records
- 4
- Bottom hole location
- 27.19302, -99.18857
27.19302, -99.18857 · NAD83, as filed⌘ or Ctrl + scroll to zoom
Drilling permits
From the Railroad Commission's drilling permit master — the application record, not a record of drilling. A permit is an application the Commission filed and numbered; the spud date is the only field here that says a hole was started. This file carries no approval status, so none is shown.
Permits
2
First issued
Jun 1 1984
to Oct 25 1990
With a spud date
2
last Nov 7 1990
Deepest permitted
13,000 ft
as applied for
| Permit | Issued | Type | Lease | Depth | Spud |
|---|---|---|---|---|---|
| 379775 | Oct 25 1990 | Recompletion | ARCO P. URIBEno. 1 | 12,100 ft | Nov 7 1990 |
| 240815 | Jun 1 1984 | Drill | URIBE, ARCO P.no. 1 | 13,000 ft | Jun 3 1984 |
What the lease produced
Texas reports oil and gas by lease, never by wellbore, so this is the whole lease. Values are volume multiplied by the published monthly price, the same arithmetic the lease page shows in full.