Peters Point U Fed 14-25D-12-16
API 43007307640000 · Carbon County, Utah · PETERS POINT field
Production
16 monthly filings with Utah, Jan 2025 to Apr 2026. Each product is in its own unit and the four are never added.
| Period | Oil (bbl) | Gas (MCF) | Water (bbl) | Days |
|---|---|---|---|---|
| Apr 2026 | 1 | 256 | 4 | 30 |
| Mar 2026 | 2 | 238 | 6 | 31 |
| Feb 2026 | 1 | 282 | 2 | 28 |
| Jan 2026 | 1 | 388 | 2 | 31 |
| Dec 2025 | 1 | 420 | 1 | 31 |
| Nov 2025 | 2 | 448 | 2 | 30 |
| Oct 2025 | 1 | 366 | 1 | 31 |
| Sep 2025 | 2 | 319 | 1 | 30 |
| Aug 2025 | 4 | 353 | 1 | 31 |
| Jul 2025 | 1 | 356 | 1 | 31 |
| Jun 2025 | 1 | 351 | 1 | 30 |
| May 2025 | 1 | 336 | 0 | 31 |
| Apr 2025 | 1 | 285 | 0 | 30 |
| Mar 2025 | 1 | 283 | 0 | 31 |
| Feb 2025 | 1 | 227 | 0 | 28 |
| Jan 2025 | 1 | 259 | 0 | 31 |
A dash is a period the well filed with no volume for that product. This corpus holds Utah’s series from 2025; the Division publishes earlier years in a separate set of files.
Work history
Utah files 1 record of work done on this well — each drill, plug, deepening, re-entry, re-perforation and recompletion, with the depths reached. One carries a production test the operator filed afterwards.
DRILL
DIRECTIONALPGWProduction test
| Tested | Oil (bbl/d) | Gas (MCF/d) | Water (bbl/d) | Gravity (°API) | Shut-in (psi) | Choke |
|---|---|---|---|---|---|---|
| 2005-11-30 | 19 | 2,358 | 36 | — | — | 21 |
A production test is one measurement the operator made on one day and filed with Utah. It is not a monthly average and it does not describe how the well produced afterwards. The choke size is shown exactly as filed: Utah records it in inches on some reports and in sixty-fourths of an inch on others, and names the unit on neither. A dash is a measurement Utah did not file, or one it filed outside any physically possible range.
Location
39.735897, -110.078474
Every well in Carbon County, Utah
Utah state record, from UT_wells_Wells.parquet. Corpus built 2026-09-11.