N Bench Fed 43-19
API 43007308340000 · Carbon County, Utah · HELPER field
Production
18 monthly filings with Utah, Jan 2025 to Jun 2026. Each product is in its own unit and the four are never added.
| Period | Oil (bbl) | Gas (MCF) | Water (bbl) | Days |
|---|---|---|---|---|
| Jun 2026 | 0 | 1,539 | 235 | 30 |
| May 2026 | 0 | 1,539 | 480 | 31 |
| Apr 2026 | 0 | 1,599 | 0 | 30 |
| Mar 2026 | 0 | 1,599 | 0 | 31 |
| Feb 2026 | 0 | 1,475 | 257 | 28 |
| Jan 2026 | 0 | 1,619 | 848 | 31 |
| Dec 2025 | 0 | 1,638 | 40 | 30 |
| Nov 2025 | 0 | 1,600 | 297 | 30 |
| Oct 2025 | 0 | 1,615 | 964 | 31 |
| Sep 2025 | 0 | 1,536 | 1,007 | 30 |
| Aug 2025 | 0 | 1,613 | 541 | 31 |
| Jul 2025 | 0 | 1,650 | 394 | 31 |
| Jun 2025 | 0 | 1,620 | 358 | 30 |
| May 2025 | 0 | 1,715 | 774 | 31 |
| Apr 2025 | 0 | 1,516 | 59 | 30 |
| Mar 2025 | 0 | 1,537 | 0 | 31 |
| Feb 2025 | 0 | 1,562 | 3 | 28 |
| Jan 2025 | 0 | 2,311 | 32 | 31 |
A dash is a period the well filed with no volume for that product. This corpus holds Utah’s series from 2025; the Division publishes earlier years in a separate set of files.
Work history
Utah files 1 record of work done on this well — each drill, plug, deepening, re-entry, re-perforation and recompletion, with the depths reached. One carries a production test the operator filed afterwards.
DRILL
VERTICALPGWProduction test
| Tested | Oil (bbl/d) | Gas (MCF/d) | Water (bbl/d) | Gravity (°API) | Shut-in (psi) | Choke |
|---|---|---|---|---|---|---|
| 2004-07-03 | 0 | 129 | 282 | — | — | — |
A production test is one measurement the operator made on one day and filed with Utah. It is not a monthly average and it does not describe how the well produced afterwards. The choke size is shown exactly as filed: Utah records it in inches on some reports and in sixty-fourths of an inch on others, and names the unit on neither. A dash is a measurement Utah did not file, or one it filed outside any physically possible range.
Location
39.678035, -110.726292
Every well in Carbon County, Utah
Utah state record, from UT_wells_Wells.parquet. Corpus built 2026-09-11.