Dillman 2-28A2
API 43013308210000 · Duchesne County, Utah · BLUEBELL field
Production
17 monthly filings with Utah, Jan 2025 to May 2026. Each product is in its own unit and the four are never added.
| Period | Oil (bbl) | Gas (MCF) | Water (bbl) | Days |
|---|---|---|---|---|
| May 2026 | 0 | 2 | 0 | 5 |
| Apr 2026 | 140 | 110 | 2,404 | 29 |
| Mar 2026 | 321 | 232 | 6,290 | 30 |
| Feb 2026 | 128 | 107 | 2,823 | 21 |
| Jan 2026 | 327 | 164 | 6,862 | 24 |
| Dec 2025 | 0 | 0 | 0 | 0 |
| Nov 2025 | 90 | 16 | 2,600 | 17 |
| Oct 2025 | 256 | 9 | 4,757 | 31 |
| Sep 2025 | 199 | 5 | 3,129 | 23 |
| Aug 2025 | 0 | 0 | 0 | 0 |
| Jul 2025 | 128 | 7 | 2,745 | 28 |
| Jun 2025 | 139 | 9 | 3,179 | 24 |
| May 2025 | 217 | 13 | 2,758 | 28 |
| Apr 2025 | 148 | 11 | 2,409 | 28 |
| Mar 2025 | 194 | 23 | 2,609 | 31 |
| Feb 2025 | 295 | 301 | 2,803 | 28 |
| Jan 2025 | 547 | 965 | 3,646 | 31 |
A dash is a period the well filed with no volume for that product. This corpus holds Utah’s series from 2025; the Division publishes earlier years in a separate set of files.
Work history
Utah files 3 records of work done on this well — each drill, plug, deepening, re-entry, re-perforation and recompletion, with the depths reached. One carries a production test the operator filed afterwards.
DRILL
VERTICALPOWProduction test
| Tested | Oil (bbl/d) | Gas (MCF/d) | Water (bbl/d) | Gravity (°API) | Shut-in (psi) | Choke |
|---|---|---|---|---|---|---|
| 1984-03-28 | 412 | 460 | 11 | 41.9 | — | — |
A production test is one measurement the operator made on one day and filed with Utah. It is not a monthly average and it does not describe how the well produced afterwards. The choke size is shown exactly as filed: Utah records it in inches on some reports and in sixty-fourths of an inch on others, and names the unit on neither. A dash is a measurement Utah did not file, or one it filed outside any physically possible range.
RECOMP
OWREPERF
CLocation
40.370122, -110.111859
Every well in Duchesne County, Utah
Utah state record, from UT_wells_Wells.parquet. Corpus built 2026-09-11.