Birch 3-27B5

API 43013311260000 · Duchesne County, Utah · ALTAMONT field

POW
API
43013311260000
Operator
Crescent Energy Operating, LLC
County
Duchesne
Measured depth
13,000 ft

Production

18 monthly filings with Utah, Jan 2025 to Jun 2026. Each product is in its own unit and the four are never added.

Cumulative oil
624 bbl
Cumulative gas
5,162 MCF
Cumulative water
15,928 bbl
PeriodOil (bbl)Gas (MCF)Water (bbl)Days
Jun 20261510172130
May 202631631,30031
Apr 202663775530
Mar 2026892742,18831
Feb 20264124364828
Jan 202601531,14631
Dec 20251410225927
Nov 2025113061,03130
Oct 20252437856131
Sep 2025226046930
Aug 2025733214313
Jul 2025535336931
Jun 20251538975130
May 2025811514921
Apr 2025623671,66030
Mar 20252154301,58931
Feb 2025593721,30528
Jan 2025484471,58431

A dash is a period the well filed with no volume for that product. This corpus holds Utah’s series from 2025; the Division publishes earlier years in a separate set of files.

Work history

Utah files 2 records of work done on this well — each drill, plug, deepening, re-entry, re-perforation and recompletion, with the depths reached. One carries a production test the operator filed afterwards.

DRILL

VERTICALPOW
Completed
1986-01-09
First production
1986-01-09
Measured depth
13,018 ft
True vertical depth
13,018 ft

Production test

TestedOil (bbl/d)Gas (MCF/d)Water (bbl/d)Gravity (°API)Shut-in (psi)Choke
1986-01-0924522824342——

A production test is one measurement the operator made on one day and filed with Utah. It is not a monthly average and it does not describe how the well produced afterwards. The choke size is shown exactly as filed: Utah records it in inches on some reports and in sixty-fourths of an inch on others, and names the unit on neither. A dash is a measurement Utah did not file, or one it filed outside any physically possible range.

RECOMP

POW
Completed
2018-05-15

Location

40.275095, -110.440379

40.27510, -110.44038 · Surface location as filed with Utah

Every well in Duchesne County, Utah

Utah state record, from UT_wells_Wells.parquet. Corpus built 2026-09-11.