Ute Tribal 15-24R

API 43013311290000 · Duchesne County, Utah · BRUNDAGE CANYON field

POW
API
43013311290000
Operator
Berry Petroleum Company LLC
County
Duchesne
Measured depth
6,050 ft

Production

18 monthly filings with Utah, Jan 2025 to Jun 2026. Each product is in its own unit and the four are never added.

Cumulative oil
931 bbl
Cumulative gas
16,098 MCF
Cumulative water
1,269 bbl
PeriodOil (bbl)Gas (MCF)Water (bbl)Days
Jun 2026435607130
May 20261485031
Apr 2026331,0785330
Mar 2026561,5487131
Feb 2026362,4334328
Jan 2026572,0967331
Dec 2025477257431
Nov 2025586367730
Oct 2025656668131
Sep 2025744399630
Aug 2025664429331
Jul 20256749611531
Jun 2025534899230
May 2025474829331
Apr 2025577469630
Mar 2025555407831
Feb 2025568986328
Jan 2025601,339031

A dash is a period the well filed with no volume for that product. This corpus holds Utah’s series from 2025; the Division publishes earlier years in a separate set of files.

Work history

Utah files 3 records of work done on this well — each drill, plug, deepening, re-entry, re-perforation and recompletion, with the depths reached. One carries a production test the operator filed afterwards.

DRILL

PAD
Completed
1985-12-09

REENTER

POW
Spudded
1996-08-23
Completed
1996-11-12
First production
1996-11-12
Measured depth
5,830 ft
True vertical depth
5,830 ft

Production test

TestedOil (bbl/d)Gas (MCF/d)Water (bbl/d)Gravity (°API)Shut-in (psi)Choke
1996-11-1260037———

A production test is one measurement the operator made on one day and filed with Utah. It is not a monthly average and it does not describe how the well produced afterwards. The choke size is shown exactly as filed: Utah records it in inches on some reports and in sixty-fourths of an inch on others, and names the unit on neither. A dash is a measurement Utah did not file, or one it filed outside any physically possible range.

REPERF

POW

Location

40.027684, -110.391929

40.02768, -110.39193 · Surface location as filed with Utah

Every well in Duchesne County, Utah

Utah state record, from UT_wells_Wells.parquet. Corpus built 2026-09-11.