Ute 3-35Z2 K

API 43013311330000 · Duchesne County, Utah · BLUEBELL field

POW
API
43013311330000
Operator
Crescent Energy Operating, LLC
County
Duchesne
Measured depth
17,000 ft

Production

18 monthly filings with Utah, Jan 2025 to Jun 2026. Each product is in its own unit and the four are never added.

Cumulative oil
7,658 bbl
Cumulative gas
3,490 MCF
Cumulative water
26,795 bbl
PeriodOil (bbl)Gas (MCF)Water (bbl)Days
Jun 20265001691,07121
May 20266582231,85431
Apr 20266462332,13730
Mar 20267123062,65431
Feb 20266592993,05128
Jan 20267253022,86531
Dec 20257363123,05031
Nov 20257062973,55130
Oct 20257593243,72831
Sep 20257222862,58921
Aug 202510161619
Jul 202593304231
Jun 202527443230
May 202574663131
Apr 2025140923030
Mar 2025151963131
Feb 20251511952828
Jan 20251892003531

A dash is a period the well filed with no volume for that product. This corpus holds Utah’s series from 2025; the Division publishes earlier years in a separate set of files.

Work history

Utah files 2 records of work done on this well — each drill, plug, deepening, re-entry, re-perforation and recompletion, with the depths reached. One carries a production test the operator filed afterwards.

DRILL

VERTICALPOW
Completed
1986-03-21
First production
1986-03-03
Measured depth
15,900 ft
True vertical depth
15,900 ft

Production test

TestedOil (bbl/d)Gas (MCF/d)Water (bbl/d)Gravity (°API)Shut-in (psi)Choke
1986-03-03401260———

A production test is one measurement the operator made on one day and filed with Utah. It is not a monthly average and it does not describe how the well produced afterwards. The choke size is shown exactly as filed: Utah records it in inches on some reports and in sixty-fourths of an inch on others, and names the unit on neither. A dash is a measurement Utah did not file, or one it filed outside any physically possible range.

REPERF

POW

Location

40.443730, -110.071177

40.44373, -110.07118 · Surface location as filed with Utah

Every well in Duchesne County, Utah

Utah state record, from UT_wells_Wells.parquet. Corpus built 2026-09-11.