Ute Tribal 31-03

API 43013311880000 · Duchesne County, Utah · ANTELOPE CREEK field

POW
API
43013311880000
Operator
Berry Petroleum Company LLC
County
Duchesne
Measured depth
6,657 ft

Production

18 monthly filings with Utah, Jan 2025 to Jun 2026. Each product is in its own unit and the four are never added.

Cumulative oil
1,085 bbl
Cumulative gas
3,315 MCF
Cumulative water
1,575 bbl
PeriodOil (bbl)Gas (MCF)Water (bbl)Days
Jun 2026421596230
May 2026571647731
Apr 2026581609730
Mar 202612516419431
Feb 20269015015028
Jan 202612415712631
Dec 2025401646631
Nov 2025532016730
Oct 2025562077531
Sep 2025561987130
Aug 2025542057731
Jul 2025522057131
Jun 2025562016530
May 2025531957031
Apr 2025431968830
Mar 2025522018431
Feb 20251517913528
Jan 202559209031

A dash is a period the well filed with no volume for that product. This corpus holds Utah’s series from 2025; the Division publishes earlier years in a separate set of files.

Work history

Utah files 3 records of work done on this well — each drill, plug, deepening, re-entry, re-perforation and recompletion, with the depths reached. One carries a production test the operator filed afterwards.

DRILL

VERTICALPOW
Completed
1987-08-15
First production
1987-08-15
Measured depth
6,657 ft
True vertical depth
6,657 ft

Production test

TestedOil (bbl/d)Gas (MCF/d)Water (bbl/d)Gravity (°API)Shut-in (psi)Choke
1987-08-154728340——

A production test is one measurement the operator made on one day and filed with Utah. It is not a monthly average and it does not describe how the well produced afterwards. The choke size is shown exactly as filed: Utah records it in inches on some reports and in sixty-fourths of an inch on others, and names the unit on neither. A dash is a measurement Utah did not file, or one it filed outside any physically possible range.

RECOMP

POW
Completed
2012-05-02

REPERF

POW

Location

40.009137, -110.266433

40.00914, -110.26643 · Surface location as filed with Utah

Every well in Duchesne County, Utah

Utah state record, from UT_wells_Wells.parquet. Corpus built 2026-09-11.